COMPARISON OF COST BUDGET ANALYSIS BETWEEN THE 2016 AHSP METHOD, AHSP 2022 METHOD AND THE CONTRACTOR'S CALCULATION METHOD ON THE WARUNG JATI RESTAURANT PROJECT, BEKASI CITY

Currently, the culinary business is a form of business that is growing in big cities such as DKI Jakarta and its surrounding cities including Bekasi City, West Java. To build a place of business, it is necessary to calculate an efficient cost budget. Therefore, researchers want to determine the use of economical methods, budget differences, and the causes of differences in cost budget calculations on the Warung Jati Restaurant project, East Bekasi, using the 2016 AHSP, 2022 AHSP and Contractor Calculation methods. In this study, the main problem that makes the difference in the AHSP method is the difference in coefficient values both in labor and materials. Examples of differences in this study are ceramic work, sitting closet work, and site mix concrete work with molen. The results obtained from this study are the 2016 AHSP Method with the Contactor Method by 4.42%, then the difference between the 2022 AHSP and the Contactor Method is 3.92%, and the difference between the 2016 & 2022 AHSP is 0.51%. From the comparison of the cost budget value by following the AHSP standard, the cost budget value is more economical by using the AHSP 2022 method. However, when compared to the Contractor Method, the more economical of the three methods in calculating the cost of the Warung Jati Restaurant project is to use the Contractor Method.

Authors

Institutions

Publication Details

Journal
DEARSIP Journal of Architecture and Civil
Published
2024-11-30
DOI
https://doi.org/10.52166/dearsip.v4i02.8028
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

COMPARISON OF COST BUDGET ANALYSIS BETWEEN THE 2016 AHSP METHOD, AHSP 2022 METHOD AND THE CONTRACTOR'S CALCULATION METHOD ON THE WARUNG JATI RESTAURANT PROJECT, BEKASI CITY

M. Fanshurullah, Messina Julian
DEARSIP Journal of Architecture and Civil
Management and Optimization Techniques
article

COMPARISON OF COST BUDGET ANALYSIS BETWEEN THE 2016 AHSP METHOD, AHSP 2022 METHOD AND THE CONTRACTOR'S CALCULATION METHOD ON THE WARUNG JATI RESTAURANT PROJECT, BEKASI CITY

M. Fanshurullah, Messina Julian
article en

Abstract

Currently, the culinary business is a form of business that is growing in big cities such as DKI Jakarta and its surrounding cities including Bekasi City, West Java. To build a place of business, it is necessary to calculate an efficient cost budget. Therefore, researchers want to determine the use of economical methods, budget differences, and the causes of differences in cost budget calculations on the Warung Jati Restaurant project, East Bekasi, using the 2016 AHSP, 2022 AHSP and Contractor Calculation methods. In this study, the main problem that makes the difference in the AHSP method is the difference in coefficient values both in labor and materials. Examples of differences in this study are ceramic work, sitting closet work, and site mix concrete work with molen. The results obtained from this study are the 2016 AHSP Method with the Contactor Method by 4.42%, then the difference between the 2022 AHSP and the Contactor Method is 3.92%, and the difference between the 2016 & 2022 AHSP is 0.51%. From the comparison of the cost budget value by following the AHSP standard, the cost budget value is more economical by using the AHSP 2022 method. However, when compared to the Contractor Method, the more economical of the three methods in calculating the cost of the Warung Jati Restaurant project is to use the Contractor Method.

DEARSIP Journal of Architecture and CivilVol. 4(02)
Pertamina (Indonesia) (ID), Universitas Pertamina
Openalex Percentile: Top 55%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

COMPARISON OF COST BUDGET ANALYSIS BETWEEN THE 2016 AHSP METHOD, AHSP 2022 METHOD AND THE CONTRACTOR'S CALCULATION METHOD ON THE WARUNG JATI RESTAURANT PROJECT, BEKASI CITY — M. Fanshurullah, Messina Julian · DEARSIP Journal of Architecture and Civil (2024) | TGRS Research Map | TGRS