ROOT CAUSES OF CHANGE IN IT PROJECTS

In this paper the author studied 58 IT projects implemented during the period 2006 -2007 and attempted to categorize the root causes of changes in those projects as well as identify the frequency of occurrence changes driven by each of those categories.The author also tried to discover relationships between the number of changes occurring and various project variables like project size, duration, etc.The research concluded that 22% of the projects implemented experienced at least one change and that the 2 most frequent causes of change were "Changed conditions" ("unbudgeted and unanticipated changes to baseline assumptions as they pertain to site conditions and weather) and "Programming Evolution" (change in/to the underlying basis of design as captured and identified in the baseline).This implies that more needs to done to identify risks that might derail the project and proactively plan responses to mitigate those risks.The fact that " "Changed Conditions" seem to be a strong driver to change as shown by this research is understandable as in today's complex IT projects and for a successful implementation many prerequisites and conditions need to be met and when they are not, change to projects become inevitable.In this research the author was also able to show that the longer the duration between the creation of the SOW and the project start (kickoff meeting), the more likely that changes will occur in the project which implies that the longer the delay in project start the more there is a need to reevaluate some of the assumptions made during the planning phase.

Authors

Institutions

Publication Details

Published
2025-01-22
DOI
https://doi.org/10.18260/1-2-1153-50195
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ROOT CAUSES OF CHANGE IN IT PROJECTS

Ossama Elhadary
Construction Project Management and Performance
article

ROOT CAUSES OF CHANGE IN IT PROJECTS

Ossama Elhadary
article en

Abstract

In this paper the author studied 58 IT projects implemented during the period 2006 -2007 and attempted to categorize the root causes of changes in those projects as well as identify the frequency of occurrence changes driven by each of those categories.The author also tried to discover relationships between the number of changes occurring and various project variables like project size, duration, etc.The research concluded that 22% of the projects implemented experienced at least one change and that the 2 most frequent causes of change were "Changed conditions" ("unbudgeted and unanticipated changes to baseline assumptions as they pertain to site conditions and weather) and "Programming Evolution" (change in/to the underlying basis of design as captured and identified in the baseline).This implies that more needs to done to identify risks that might derail the project and proactively plan responses to mitigate those risks.The fact that " "Changed Conditions" seem to be a strong driver to change as shown by this research is understandable as in today's complex IT projects and for a successful implementation many prerequisites and conditions need to be met and when they are not, change to projects become inevitable.In this research the author was also able to show that the longer the duration between the creation of the SOW and the project start (kickoff meeting), the more likely that changes will occur in the project which implies that the longer the delay in project start the more there is a need to reevaluate some of the assumptions made during the planning phase.

Brooklyn Navy Yard (US)
Openalex Percentile: Top 99%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.