Energy-saving and economic feasibility of a battery-integrated combined cooling, heating and power (CCHP) plant through waste heat recovery for H2O-NH3 based absorption, power and cooling (APC) system

In this work the energy-saving potential and economic feasibility of a new trigeneration plant for a Hospital's facility was explored. The study focused on the integration of an ammonia-water absorption, power and cooling (APC) system inside a battery-integrated natural gas internal combustion engines (ICEs) based-CHP plant to constitute a highly flexible combined cooling, heating, and power plant (CCHP-BESS). Through onsite measurements the energy demand profile of the Oncological Reference Center Hospital (CROB), located in Italy, was obtained, then integrated with the mathematical models of the individual subsystems, tuned with experimental data. A proper control strategy was employed to maximize the efficiency of the plant, prioritizing the cooling or electric power production as a function of the Hospital's hourly demand. Results indicate the proposed CCHP-BESS configuration reaches a fossil primary energy saving of 19.88 % and an additional 23.99 % reduction in CO 2 emissions compared to the CROB’S separate production of the same amount of energy. Despite a relatively high investment cost of the proposed plant, mostly attributed to the experimental nature of the ammonia-based turbine of the APC subsystem, the economic assessment shows a 3.3 years for the simple-pay back (SPB) period. • The CCHP-BESS plant showed a 19.44 % increase in primary energy savings compared to the stand-alone Hospital facility. • The CCHP-BESS system achieved a notable 23.99 % reduction in CO2 emissions. • Peak grid demand dropped by 32.46%, reflecting the system'seffective management of electric demand • The integration of the absorption, power and cooling (APC) system reduced dependency on external ppower sources.

Authors

Publication Details

Journal
Energy
Published
2025-01-23
DOI
https://doi.org/10.1016/j.energy.2025.134640
Citations
8
Primary Topic
Thermodynamic and Exergetic Analyses of Power and Cooling Systems
Type
article
Field-Weighted Citation Impact
5.71
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Energy-saving and economic feasibility of a battery-integrated combined cooling, heating and power (CCHP) plant through waste heat recovery for H2O-NH3 based absorption, power and cooling (APC) system

Alfredo Gimelli, Raffaele Iossa, Massimiliano Muccillo, Simone Braccio et al.
8 citations
Energy
Thermodynamic and Exergetic Analyses of Power and Cooling Systems
5.71
article

Energy-saving and economic feasibility of a battery-integrated combined cooling, heating and power (CCHP) plant through waste heat recovery for H2O-NH3 based absorption, power and cooling (APC) system

Alfredo Gimelli, Raffaele Iossa, Massimiliano Muccillo, Simone Braccio, Hai Trieu Phan, Ali Karimi
article en
8 citations

Abstract

In this work the energy-saving potential and economic feasibility of a new trigeneration plant for a Hospital's facility was explored. The study focused on the integration of an ammonia-water absorption, power and cooling (APC) system inside a battery-integrated natural gas internal combustion engines (ICEs) based-CHP plant to constitute a highly flexible combined cooling, heating, and power plant (CCHP-BESS). Through onsite measurements the energy demand profile of the Oncological Reference Center Hospital (CROB), located in Italy, was obtained, then integrated with the mathematical models of the individual subsystems, tuned with experimental data. A proper control strategy was employed to maximize the efficiency of the plant, prioritizing the cooling or electric power production as a function of the Hospital's hourly demand. Results indicate the proposed CCHP-BESS configuration reaches a fossil primary energy saving of 19.88 % and an additional 23.99 % reduction in CO 2 emissions compared to the CROB’S separate production of the same amount of energy. Despite a relatively high investment cost of the proposed plant, mostly attributed to the experimental nature of the ammonia-based turbine of the APC subsystem, the economic assessment shows a 3.3 years for the simple-pay back (SPB) period. • The CCHP-BESS plant showed a 19.44 % increase in primary energy savings compared to the stand-alone Hospital facility. • The CCHP-BESS system achieved a notable 23.99 % reduction in CO2 emissions. • Peak grid demand dropped by 32.46%, reflecting the system'seffective management of electric demand • The integration of the absorption, power and cooling (APC) system reduced dependency on external ppower sources.

EnergyVol. 317
Affordable and clean energy
Openalex Percentile: Top 4%
Thermodynamic and Exergetic Analyses of Power and Cooling Systems
5.71
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.