Performance Evaluation of Time and Cost In The Bungur-Kedoyo Tulungagung Road Construction Project Using The Earned Value Method

Road infrastructure is essential for supporting transportation, fostering economic growth, and enhancing community mobility. However, the Bungur-Kedoyo road construction project in Tulungagung has faced challenges in time and cost management, impacting overall project performance. This study aims to evaluate the project's time and cost performance using the Earned Value Method (EVM), a robust tool that compares planned work, completed work, and actual costs to provide a comprehensive performance analysis. Data from the 25th-week project report revealed delays, with a Schedule Variance (SV) of -Rp. 315,481,514.90 and a Schedule Performance Index (SPI) of 0.970, indicating slower progress than initially planned (SPI < 1). These results highlight the need for improved project scheduling and enhanced control mechanisms to mitigate delays and manage costs effectively. By identifying inefficiencies and areas requiring intervention, the study provides actionable recommendations for improving project management practices. It concludes that integrating EVM into time and cost control processes can significantly enhance project efficiency and reliability. This research contributes to advancing infrastructure development by offering insights that can be applied to similar projects, ensuring timely and cost-effective delivery while promoting sustainable growth in the road construction sector.

Authors

Institutions

Publication Details

Journal
Devotion Journal of Research and Community Service
Published
2025-01-23
DOI
https://doi.org/10.59188/devotion.v6i1.25402
Primary Topic
Value Engineering and Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Performance Evaluation of Time and Cost In The Bungur-Kedoyo Tulungagung Road Construction Project Using The Earned Value Method

Sajiyo Sajiyo, Andi Patriadi, Moh. Bahrudin
Devotion Journal of Research and Community Service
Value Engineering and Management
article

Performance Evaluation of Time and Cost In The Bungur-Kedoyo Tulungagung Road Construction Project Using The Earned Value Method

Sajiyo Sajiyo, Andi Patriadi, Moh. Bahrudin
article en

Abstract

Road infrastructure is essential for supporting transportation, fostering economic growth, and enhancing community mobility. However, the Bungur-Kedoyo road construction project in Tulungagung has faced challenges in time and cost management, impacting overall project performance. This study aims to evaluate the project's time and cost performance using the Earned Value Method (EVM), a robust tool that compares planned work, completed work, and actual costs to provide a comprehensive performance analysis. Data from the 25th-week project report revealed delays, with a Schedule Variance (SV) of -Rp. 315,481,514.90 and a Schedule Performance Index (SPI) of 0.970, indicating slower progress than initially planned (SPI < 1). These results highlight the need for improved project scheduling and enhanced control mechanisms to mitigate delays and manage costs effectively. By identifying inefficiencies and areas requiring intervention, the study provides actionable recommendations for improving project management practices. It concludes that integrating EVM into time and cost control processes can significantly enhance project efficiency and reliability. This research contributes to advancing infrastructure development by offering insights that can be applied to similar projects, ensuring timely and cost-effective delivery while promoting sustainable growth in the road construction sector.

Devotion Journal of Research and Community ServiceVol. 6(1)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 99%
Value Engineering and Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.