Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar

The installation of the Baggage Handling System (BHS) at Sultan Hasanuddin International Airport, Makassar, faces challenges related to cost and time inefficiencies, particularly delays in project completion. This study aims to evaluate these inefficiencies by applying the Earned Value Method (EVM) to assess project performance and identify areas for improvement. Utilizing EVM metrics, the research identifies that the Schedule Performance Index (SPI) is below 1, indicating a delay in the project timeline, with the actual duration extending to 556 calendar days compared to the planned 546 days. This delay underscores the need for a more robust project management approach. The study employs the Critical Path Method (CPM) in conjunction with Microsoft Project to improve scheduling accuracy, alongside recommendations for project acceleration using the Crashing Program method. The findings highlight that early implementation of EVM can help mitigate discrepancies in cost and time, enabling better control and monitoring throughout the project lifecycle. The study concludes that integrating advanced scheduling techniques and real-time performance metrics is essential to achieving efficiency and minimizing delays in similar infrastructure projects.

Authors

Institutions

Publication Details

Journal
Asian Journal of Social and Humanities
Published
2025-01-22
DOI
https://doi.org/10.59888/ajosh.v3i4.478
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar

Haris Muhammadun, Laksono Djoko Nugroho, Irwansyah Digma Pratama
Asian Journal of Social and Humanities
Management and Optimization Techniques
article

Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar

Haris Muhammadun, Laksono Djoko Nugroho, Irwansyah Digma Pratama
article en

Abstract

The installation of the Baggage Handling System (BHS) at Sultan Hasanuddin International Airport, Makassar, faces challenges related to cost and time inefficiencies, particularly delays in project completion. This study aims to evaluate these inefficiencies by applying the Earned Value Method (EVM) to assess project performance and identify areas for improvement. Utilizing EVM metrics, the research identifies that the Schedule Performance Index (SPI) is below 1, indicating a delay in the project timeline, with the actual duration extending to 556 calendar days compared to the planned 546 days. This delay underscores the need for a more robust project management approach. The study employs the Critical Path Method (CPM) in conjunction with Microsoft Project to improve scheduling accuracy, alongside recommendations for project acceleration using the Crashing Program method. The findings highlight that early implementation of EVM can help mitigate discrepancies in cost and time, enabling better control and monitoring throughout the project lifecycle. The study concludes that integrating advanced scheduling techniques and real-time performance metrics is essential to achieving efficiency and minimizing delays in similar infrastructure projects.

Asian Journal of Social and HumanitiesVol. 3(4)
Universitas 17 Agustus 1945 Surabaya (ID)
Openalex Percentile: Top 99%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar — Haris Muhammadun, Laksono Djoko Nugroho, et al. · Asian Journal of Social and Humanities (2025) | TGRS Research Map | TGRS