Feasibility Analysis of the Sorong Special Economic Zone (SEZ) Location, Provinsi Papua Barat Daya

Government Regulation Number 31 of 2016 designated the Sorong Special Economic Zone (KEK) as the first Special Economic Zone in Papua. The establishment of the Sorong SEZ is expected to become a new center of economic growth in eastern Indonesia, in line with one of the principles of Nawacita, namely building Indonesia from the outskirts. This study employs the analysis of location feasibility, environmental feasibility, technical feasibility, and financial feasibility. The variables of this study are slope, land use, flood-prone, landslide-prone, and suitability of spatial pattern, as well as environmental feasibility, land use, flood-prone, landslide-prone, spatial planning, environment, technical, and economic and financial. The location of the Sorong SEZ in Provinsi Papua Barat Daya is based on the overlay with the Sorong Regency RTRW, most of the Sorong SEZ is an industrial area with a mostly gentle slope, not included in the landslide-prone area, but has a fairly high flood-prone area. Environmental feasibility dictates that the Sorong SEZ area is located in a coastal/beach area, thereby prohibiting companies from using groundwater as a raw water source for their operations. The existence of infrastructure such as the 50 MW PLN Power Plant, Arar Port, clean water network, and others makes the Sorong Special Economic Zone technically qualified as the Sorong Special Economic Zone. The Sorong Economic Zone Development Financing Plan, based on its economic and financial feasibility, provides the following details: The plan includes initial preparation costs of IDR 1,124,659,690,000, infrastructure costs of IDR 236,390,000,000, general facility costs of IDR 235,315,000,000, and basic infrastructure costs of IDR 800,000,000,000.

Authors

Institutions

Publication Details

Journal
Jurnal Geografika (Geografi Lingkungan Lahan Basah)
Published
2024-12-31
DOI
https://doi.org/10.20527/jgp.v5i2.13536
Primary Topic
Economic Zones and Regional Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Feasibility Analysis of the Sorong Special Economic Zone (SEZ) Location, Provinsi Papua Barat Daya

Tamrin Tajuddin, Masniar Masniar, La Ibal
Jurnal Geografika (Geografi Lingkungan Lahan Basah)
Economic Zones and Regional Development
article

Feasibility Analysis of the Sorong Special Economic Zone (SEZ) Location, Provinsi Papua Barat Daya

Tamrin Tajuddin, Masniar Masniar, La Ibal
article en

Abstract

Government Regulation Number 31 of 2016 designated the Sorong Special Economic Zone (KEK) as the first Special Economic Zone in Papua. The establishment of the Sorong SEZ is expected to become a new center of economic growth in eastern Indonesia, in line with one of the principles of Nawacita, namely building Indonesia from the outskirts. This study employs the analysis of location feasibility, environmental feasibility, technical feasibility, and financial feasibility. The variables of this study are slope, land use, flood-prone, landslide-prone, and suitability of spatial pattern, as well as environmental feasibility, land use, flood-prone, landslide-prone, spatial planning, environment, technical, and economic and financial. The location of the Sorong SEZ in Provinsi Papua Barat Daya is based on the overlay with the Sorong Regency RTRW, most of the Sorong SEZ is an industrial area with a mostly gentle slope, not included in the landslide-prone area, but has a fairly high flood-prone area. Environmental feasibility dictates that the Sorong SEZ area is located in a coastal/beach area, thereby prohibiting companies from using groundwater as a raw water source for their operations. The existence of infrastructure such as the 50 MW PLN Power Plant, Arar Port, clean water network, and others makes the Sorong Special Economic Zone technically qualified as the Sorong Special Economic Zone. The Sorong Economic Zone Development Financing Plan, based on its economic and financial feasibility, provides the following details: The plan includes initial preparation costs of IDR 1,124,659,690,000, infrastructure costs of IDR 236,390,000,000, general facility costs of IDR 235,315,000,000, and basic infrastructure costs of IDR 800,000,000,000.

Jurnal Geografika (Geografi Lingkungan Lahan Basah)Vol. 5(2)
Universitas Muhamadiyah Sorong (ID)
Openalex Percentile: Top 52%
Economic Zones and Regional Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.