Post-Contract Cost Control for Building Construction Projects

Cost control is implemented to manage the cost of construction projects. Cost control is important in both pre-contract and post-contract stage but it is more vital in the latter stage.  It is a continuous process and must be conducted throughout the project to ensure the final construction cost does not exceed the estimated cost and thus preventing cost overrun. Various factors may lead to cost overrun especially in building construction projects. Inadequate cost management is not a matter to be taken lightly because it results in a large number of cost overrun. This alarming problem is not only negatively affecting the parties involved in the project but also the nation. Hence, this study is carried out with the aim to mitigate cost overrun by practicing effective cost control. This research is conducted to identify the post-contract cost control practices implemented by contractors for building construction projects, the challenges encountered and the strategies to overcome the challenges. The method utilized is the quantitative method which is conducting questionnaire survey. 28 respondents from G6 and G7 contractors have provided feedbacks and the results obtained are analyzed by using Statistical Social Package Science (SPSS). For the first objective, the post-contract cost control practices for building construction projects include monitoring material cost, using bill of quantities to manage construction cost, monitoring overheads, monitoring labour cost and interim valuations. For the second objective, the challenges encountered include poor project planning, poor communication between project parties, improper contract documentation and unpredictable construction work environment. For the last objective, the strategies to overcome the challenges include good construction planning, effective site supervision, appointment of qualified management staff, good co-ordination between project team members, clear understanding of the project scope, effective contract administration, effective site management, clear process of the project control and use of appropriate construction methods.

Authors

Publication Details

Journal
Journal of Technology Management and Business
Published
2024-12-11
DOI
https://doi.org/10.30880/jtmb.2024.11.02.001
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Post-Contract Cost Control for Building Construction Projects

Tan Chin Keng, Nur Fariza Suleiman
Journal of Technology Management and Business
BIM and Construction Integration
article

Post-Contract Cost Control for Building Construction Projects

Tan Chin Keng, Nur Fariza Suleiman
article en

Abstract

Cost control is implemented to manage the cost of construction projects. Cost control is important in both pre-contract and post-contract stage but it is more vital in the latter stage.  It is a continuous process and must be conducted throughout the project to ensure the final construction cost does not exceed the estimated cost and thus preventing cost overrun. Various factors may lead to cost overrun especially in building construction projects. Inadequate cost management is not a matter to be taken lightly because it results in a large number of cost overrun. This alarming problem is not only negatively affecting the parties involved in the project but also the nation. Hence, this study is carried out with the aim to mitigate cost overrun by practicing effective cost control. This research is conducted to identify the post-contract cost control practices implemented by contractors for building construction projects, the challenges encountered and the strategies to overcome the challenges. The method utilized is the quantitative method which is conducting questionnaire survey. 28 respondents from G6 and G7 contractors have provided feedbacks and the results obtained are analyzed by using Statistical Social Package Science (SPSS). For the first objective, the post-contract cost control practices for building construction projects include monitoring material cost, using bill of quantities to manage construction cost, monitoring overheads, monitoring labour cost and interim valuations. For the second objective, the challenges encountered include poor project planning, poor communication between project parties, improper contract documentation and unpredictable construction work environment. For the last objective, the strategies to overcome the challenges include good construction planning, effective site supervision, appointment of qualified management staff, good co-ordination between project team members, clear understanding of the project scope, effective contract administration, effective site management, clear process of the project control and use of appropriate construction methods.

Journal of Technology Management and BusinessVol. 11(2)
International Islamic University Malaysia
Sustainable cities and communities
Openalex Percentile: Top 72%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.