Estimation of Nickel Laterite Resources and Reserves Using Ordinary Kriging and Inverse Distance Weighting (IDW) Methods: A Case Study from the Kolaka Block, PT Indrabakti Mustika, North Konawe Regency, Southeast Sulawesi

This study aims to assess the geological domains and estimate the nickel laterite resources and reserves within the Kolaka Block exploration area at PT Indrabakti Mustika, utilizing the Ordinary Kriging and Inverse Distance Weight (IDW) methods. The research employs quantitative and qualitative approaches to evaluate the geological framework and estimate the nickel laterite resources and reserves. Geological domain classification—limonite, saprolite, and bedrock layers—was achieved through detailed core section analysis, which informed the delineation of the nickel laterite zones. Based on the IDW method, the resource estimation results indicate 3,180,350 m³ (4,611,509 metric tons) of nickel laterite resources. This is subdivided into limonite zone resources (1,547,475 m³ or 2,243,840 metric tons) and saprolite zone resources (1,632,875 m³ or 2,367,669 metric tons). Using the Ordinary Kriging method, the total nickel laterite resource is estimated at 3,212,275 m³ (4,657,801 metric tons), with the limonite zone contributing 1,562,500 m³ (2,265,627 metric tons) and the saprolite zone contributing 1,649,775 m³ (2,392,174 metric tons). For the reserve estimation, the IDW method suggests a total of 1,205,875 m³ (1,748,520 metric tons) of nickel laterite reserves. These reserves are divided into limonite zone reserves (456,275 m³ or 661,600 metric tons) and saprolite zone reserves (749,600 m³ or 1,086,920 metric tons). In contrast, the Ordinary Kriging method estimates a total of 1,142,225 m³ (1,656,227 metric tons) of reserves, with limonite zone reserves of 516,700 m³ (749,216 metric tons) and saprolite zone reserves of 625,525 m³ (907,011 metric tons). These findings provide a comprehensive understanding of nickel laterite's geological and resource distribution in the Kolaka Block, offering crucial data for further exploration and development activities at PT Indrabakti Mustika.

Authors

Institutions

Publication Details

Journal
Journal of Earth and Marine Technology (JEMT)
Published
2024-12-31
DOI
https://doi.org/10.31284/j.jemt.2024.v5i1.6190
Citations
1
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.33
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Estimation of Nickel Laterite Resources and Reserves Using Ordinary Kriging and Inverse Distance Weighting (IDW) Methods: A Case Study from the Kolaka Block, PT Indrabakti Mustika, North Konawe Regency, Southeast Sulawesi

I Ketut Gede Darma Putra, Sapto Heru Yuwanto, Avellyn Shinthya Sari
1 citations
Journal of Earth and Marine Technology (JEMT)
Mining Techniques and Economics
0.33
article

Estimation of Nickel Laterite Resources and Reserves Using Ordinary Kriging and Inverse Distance Weighting (IDW) Methods: A Case Study from the Kolaka Block, PT Indrabakti Mustika, North Konawe Regency, Southeast Sulawesi

I Ketut Gede Darma Putra, Sapto Heru Yuwanto, Avellyn Shinthya Sari
article en
1 citations

Abstract

This study aims to assess the geological domains and estimate the nickel laterite resources and reserves within the Kolaka Block exploration area at PT Indrabakti Mustika, utilizing the Ordinary Kriging and Inverse Distance Weight (IDW) methods. The research employs quantitative and qualitative approaches to evaluate the geological framework and estimate the nickel laterite resources and reserves. Geological domain classification—limonite, saprolite, and bedrock layers—was achieved through detailed core section analysis, which informed the delineation of the nickel laterite zones. Based on the IDW method, the resource estimation results indicate 3,180,350 m³ (4,611,509 metric tons) of nickel laterite resources. This is subdivided into limonite zone resources (1,547,475 m³ or 2,243,840 metric tons) and saprolite zone resources (1,632,875 m³ or 2,367,669 metric tons). Using the Ordinary Kriging method, the total nickel laterite resource is estimated at 3,212,275 m³ (4,657,801 metric tons), with the limonite zone contributing 1,562,500 m³ (2,265,627 metric tons) and the saprolite zone contributing 1,649,775 m³ (2,392,174 metric tons). For the reserve estimation, the IDW method suggests a total of 1,205,875 m³ (1,748,520 metric tons) of nickel laterite reserves. These reserves are divided into limonite zone reserves (456,275 m³ or 661,600 metric tons) and saprolite zone reserves (749,600 m³ or 1,086,920 metric tons). In contrast, the Ordinary Kriging method estimates a total of 1,142,225 m³ (1,656,227 metric tons) of reserves, with limonite zone reserves of 516,700 m³ (749,216 metric tons) and saprolite zone reserves of 625,525 m³ (907,011 metric tons). These findings provide a comprehensive understanding of nickel laterite's geological and resource distribution in the Kolaka Block, offering crucial data for further exploration and development activities at PT Indrabakti Mustika.

Journal of Earth and Marine Technology (JEMT)Vol. 5(1)
Institut Teknologi Adhi Tama Surabaya (ID)
Openalex Percentile: Top 37%
Mining Techniques and Economics
0.33
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.