Research on risk prevention and control measures for immersed tube tunnel projects

This paper establishes an effective risk analysis and control system based on the characteristics of cross-sea immersed tube tunnel construction. Taking immersed tube tunnel projects as an example, this study investigates risk prevention and control measures. Firstly, a matrix of membership degrees and fuzzy sets for risk factors at various stages of immersed tube tunnel projects is constructed, and their weights are calculated. Then, based on the fuzzy comprehensive evaluation method, the overall risk level for each stage of the project is calculated. Risk factors with higher weights are identified, as they indicate a greater likelihood of accidents. Control measures are proposed for these high-weight risk factors, and real-time control is implemented during the construction process of the immersed tube tunnel. Finally, this method and control measures are applied in an engineering case study to provide a theoretical basis for preventing major risks in engineering projects and for risk prevention and control in similar projects.

Authors

Institutions

Publication Details

Published
2024-10-18
DOI
https://doi.org/10.1145/3708036.3708201
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on risk prevention and control measures for immersed tube tunnel projects

Sainan Fu, Chun Meng, Haojie Gu, Xiaoxuan Meng et al.
Underground infrastructure and sustainability
article

Research on risk prevention and control measures for immersed tube tunnel projects

Sainan Fu, Chun Meng, Haojie Gu, Xiaoxuan Meng, Jiao Zhang, Ge Kong
article en

Abstract

This paper establishes an effective risk analysis and control system based on the characteristics of cross-sea immersed tube tunnel construction. Taking immersed tube tunnel projects as an example, this study investigates risk prevention and control measures. Firstly, a matrix of membership degrees and fuzzy sets for risk factors at various stages of immersed tube tunnel projects is constructed, and their weights are calculated. Then, based on the fuzzy comprehensive evaluation method, the overall risk level for each stage of the project is calculated. Risk factors with higher weights are identified, as they indicate a greater likelihood of accidents. Control measures are proposed for these high-weight risk factors, and real-time control is implemented during the construction process of the immersed tube tunnel. Finally, this method and control measures are applied in an engineering case study to provide a theoretical basis for preventing major risks in engineering projects and for risk prevention and control in similar projects.

Hubei Urban Construction Vocational and Technological College (CN)
Openalex Percentile: Top 72%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.