Optimizing the Automation in Construction Site Logistics: Problems and Propsed Modell Library for Materials Flow Simulation

The construction industry is currently facing challenges such as skilled labor shortages, limited automation, and inadequate digitalization, particularly for small and medium-sized enterprises (SME), amidst rising interest rates and decreasing subsidies for builders. To address these challenges, a simulation model library for construction is being established. The Plant Simulation System is used to map construction site systems with various model components, enabling digital simulation of the environment and supply chains. Customized simulation parameters are used to simulate specific construction requirements. This paper describes the use of masonry robots and transportation in wall and floor construction and their impact on site performance. The simulation model library REMUS is important for digitalizing construction sites, allowing for the assessment of innovative systems before construction and estimation of investment returns. Simulations can be used to evaluate investments and future concepts.

Authors

Institutions

Publication Details

Published
2024-12-15
DOI
https://doi.org/10.1109/wsc63780.2024.10838777
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing the Automation in Construction Site Logistics: Problems and Propsed Modell Library for Materials Flow Simulation

Martin Barth, Jörg Franke, Peter Schuderer, Alexander Schlosser
BIM and Construction Integration
article

Optimizing the Automation in Construction Site Logistics: Problems and Propsed Modell Library for Materials Flow Simulation

Martin Barth, Jörg Franke, Peter Schuderer, Alexander Schlosser
article en

Abstract

The construction industry is currently facing challenges such as skilled labor shortages, limited automation, and inadequate digitalization, particularly for small and medium-sized enterprises (SME), amidst rising interest rates and decreasing subsidies for builders. To address these challenges, a simulation model library for construction is being established. The Plant Simulation System is used to map construction site systems with various model components, enabling digital simulation of the environment and supply chains. Customized simulation parameters are used to simulate specific construction requirements. This paper describes the use of masonry robots and transportation in wall and floor construction and their impact on site performance. The simulation model library REMUS is important for digitalizing construction sites, allowing for the assessment of innovative systems before construction and estimation of investment returns. Simulations can be used to evaluate investments and future concepts.

Technische Hochschule Ingolstadt (DE)
Industry, innovation and infrastructure
Openalex Percentile: Top 72%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.