Matrix Assembly System Scheduling Optimization in Automotive Manufacturing: A Deep Q-Network Approach

In response to the demand diversification in automobile production, traditional manufacturing processes are transitioning towards more flexible systems with dynamic scheduling methods. The Matrix System (MS) stands out for its utilization of Autonomous Mobile Robots (AMRs) and multi-purposed workstations, enabling a dynamic production environment. Each AMR is tasked with transporting a partially assembled vehicle through multiple workstations until final assembly, adhering to predefined precedence orders. However, determining operation schedules amidst the complexity of multi-model systems poses a significant challenge in minimizing manufacturing time. To address this, we formalize the problem into a Markov Decision Process (MDP) and propose a Deep Q-Network (DQN) based scheduling optimization algorithm for the Vehicles Production Scheduling (VPS) problem. Our approach utilizes discrete event simulation to assess candidate actions suggested by the DQN, aiming to derive an optimal policy. This paper validated the proposed algorithm by comparing with various dispatching rules.

Authors

Institutions

Publication Details

Published
2024-12-15
DOI
https://doi.org/10.1109/wsc63780.2024.10838829
Citations
1
Primary Topic
Assembly Line Balancing Optimization
Type
article
Field-Weighted Citation Impact
0.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Matrix Assembly System Scheduling Optimization in Automotive Manufacturing: A Deep Q-Network Approach

Jorge Arinez, Sang Do Noh, Hua-Tzu Fan, J.S. Park et al.
1 citations
Assembly Line Balancing Optimization
0.35
article

Matrix Assembly System Scheduling Optimization in Automotive Manufacturing: A Deep Q-Network Approach

Jorge Arinez, Sang Do Noh, Hua-Tzu Fan, J.S. Park, Whan Lee, Sining An, Chang‐Ha Lee, Seog‐Chan Oh
article en
1 citations

Abstract

In response to the demand diversification in automobile production, traditional manufacturing processes are transitioning towards more flexible systems with dynamic scheduling methods. The Matrix System (MS) stands out for its utilization of Autonomous Mobile Robots (AMRs) and multi-purposed workstations, enabling a dynamic production environment. Each AMR is tasked with transporting a partially assembled vehicle through multiple workstations until final assembly, adhering to predefined precedence orders. However, determining operation schedules amidst the complexity of multi-model systems poses a significant challenge in minimizing manufacturing time. To address this, we formalize the problem into a Markov Decision Process (MDP) and propose a Deep Q-Network (DQN) based scheduling optimization algorithm for the Vehicles Production Scheduling (VPS) problem. Our approach utilizes discrete event simulation to assess candidate actions suggested by the DQN, aiming to derive an optimal policy. This paper validated the proposed algorithm by comparing with various dispatching rules.

General Motors (United States) (US), Sungkyunkwan University (KR)
Openalex Percentile: Top 31%
Assembly Line Balancing Optimization
0.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.