Order Lead Time Influencing Factors in the Semiconductor Supply Chain

Determining and communicating reliable order lead time information is vital to retain customers and increase supply chain resilience, especially in complex settings such as the semiconductor supply chain. To overcome shortcomings of recent research on order lead time and its influencing factors, we collect order data from a global semiconductor manufacturer that captures both make-to-plan and make-to-order information within the internal supply chain. Our contribution is twofold. First, our results support an accurate prediction of the confirmed order lead time and thus its reliable communication to customers. We develop three linear regression models: one general, one conventional, and one model for particular situations where standard delivery times are hard to determine. Second, we develop three specific managerial implications by analyzing influencing factors that highly correlate with the confirmed order lead time and capture information on the customer request, order fulfillment details, and product specifics.

Authors

Institutions

Publication Details

Published
2024-12-15
DOI
https://doi.org/10.1109/wsc63780.2024.10838836
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Order Lead Time Influencing Factors in the Semiconductor Supply Chain

Marco Ratusny, Patrick Moder, Fabian Gassner
Scheduling and Optimization Algorithms
article

Order Lead Time Influencing Factors in the Semiconductor Supply Chain

Marco Ratusny, Patrick Moder, Fabian Gassner
article en

Abstract

Determining and communicating reliable order lead time information is vital to retain customers and increase supply chain resilience, especially in complex settings such as the semiconductor supply chain. To overcome shortcomings of recent research on order lead time and its influencing factors, we collect order data from a global semiconductor manufacturer that captures both make-to-plan and make-to-order information within the internal supply chain. Our contribution is twofold. First, our results support an accurate prediction of the confirmed order lead time and thus its reliable communication to customers. We develop three linear regression models: one general, one conventional, and one model for particular situations where standard delivery times are hard to determine. Second, we develop three specific managerial implications by analyzing influencing factors that highly correlate with the confirmed order lead time and capture information on the customer request, order fulfillment details, and product specifics.

Infineon Technologies (Germany) (DE)
Affordable and clean energy
Openalex Percentile: Top 62%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Order Lead Time Influencing Factors in the Semiconductor Supply Chain — Marco Ratusny, Patrick Moder, et al. · (2024) | TGRS Research Map | TGRS