Building Equitable Student Project Groups - A Simulation Study to Assess Heuristic Assignment Methods

This paper explores methods for forming equitable project groups in a class by minimizing the range in mean cumulative quality point averages (CQPAs) across the groups. Using simulation, it forms representative classes of various sizes from real-world CQPA data, and it compares the approximate solutions of seven heuristic assignment methods to the globally optimal solutions found with mixed integer linear programming. Finding a near optimal heuristic is useful as exact methods can be computationally expensive or require specialized knowledge or software. Simulation results indicate that the Alternating Convergence heuristic consistently outperforms the other six heuristics, generating near optimal solutions with low computational cost. This suggests the Alternating Convergence heuristic is a practical method for building project groups when equitability in scholastic achievement supports one's pedagogical philosophy or objectives.

Authors

Institutions

Publication Details

Published
2024-12-15
DOI
https://doi.org/10.1109/wsc63780.2024.10838886
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Building Equitable Student Project Groups - A Simulation Study to Assess Heuristic Assignment Methods

Matthew Dabkowski, Stephen Gillespie, Ian Kloo, Mai Tran et al.
Construction Project Management and Performance
article

Building Equitable Student Project Groups - A Simulation Study to Assess Heuristic Assignment Methods

Matthew Dabkowski, Stephen Gillespie, Ian Kloo, Mai Tran, Devon Compeau
article en

Abstract

This paper explores methods for forming equitable project groups in a class by minimizing the range in mean cumulative quality point averages (CQPAs) across the groups. Using simulation, it forms representative classes of various sizes from real-world CQPA data, and it compares the approximate solutions of seven heuristic assignment methods to the globally optimal solutions found with mixed integer linear programming. Finding a near optimal heuristic is useful as exact methods can be computationally expensive or require specialized knowledge or software. Simulation results indicate that the Alternating Convergence heuristic consistently outperforms the other six heuristics, generating near optimal solutions with low computational cost. This suggests the Alternating Convergence heuristic is a practical method for building project groups when equitability in scholastic achievement supports one's pedagogical philosophy or objectives.

United States Military Academy (US)
U.S. Department of Defense, U.S. Army, U.S. Military Academy
Openalex Percentile: Top 68%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Building Equitable Student Project Groups - A Simulation Study to Assess Heuristic Assignment Methods — Matthew Dabkowski, Stephen Gillespie, et al. · (2024) | TGRS Research Map | TGRS