A New Optimization Method for Power Resource Allocation Based on Data Analysis

To improve the overall utilization rate of resources and carry out unified security management of resources, a method for predicting the future task volume and resource demand of users is proposed based on the long short-term memory network model. Firstly, the training model was established according to the initial sample set of sample data information. The prediction model in the long short-term memory network model is used to predict the amount of future tasks [1]. Resource requirements are then mapped based on the calculation of future task volumes. Based on the long short-term memory network model, the method comprehensively considers the user’s historical law, time, business characteristics and other latitudes, analyzes the mapping relationship between the user’s task volume and the required resources based on the correlation analysis technology, and establishes a mapping model from the task volume to the resource demand, to realize the accurate prediction of the user’s future task volume and resource demand.

Authors

Institutions

Publication Details

Published
2024-08-14
DOI
https://doi.org/10.1109/peeec63877.2024.00227
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A New Optimization Method for Power Resource Allocation Based on Data Analysis

Dingding Li, Kezhen Liu, Ruimin Wang, Shuai Li et al.
Power Systems and Renewable Energy
article

A New Optimization Method for Power Resource Allocation Based on Data Analysis

Dingding Li, Kezhen Liu, Ruimin Wang, Shuai Li, Fangfang Dang
article en

Abstract

To improve the overall utilization rate of resources and carry out unified security management of resources, a method for predicting the future task volume and resource demand of users is proposed based on the long short-term memory network model. Firstly, the training model was established according to the initial sample set of sample data information. The prediction model in the long short-term memory network model is used to predict the amount of future tasks [1]. Resource requirements are then mapped based on the calculation of future task volumes. Based on the long short-term memory network model, the method comprehensively considers the user’s historical law, time, business characteristics and other latitudes, analyzes the mapping relationship between the user’s task volume and the required resources based on the correlation analysis technology, and establishes a mapping model from the task volume to the resource demand, to realize the accurate prediction of the user’s future task volume and resource demand.

Zhengzhou University (CN)
Openalex Percentile: Top 72%
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A New Optimization Method for Power Resource Allocation Based on Data Analysis — Dingding Li, Kezhen Liu, et al. · (2024) | TGRS Research Map | TGRS