Development of IC Scheduling Management System
IC integrated circuits are the core component of modern electronic products, and their production process is complex and precise. Therefore, popularizing human knowledge of IC integrated circuits and introducing the concept of integrated circuit scheduling can effectively promote industrial automation and reduce labor costs. Making scientific decisions is extremely important and requires further exploration. This system adopts a front-end and back-end separation development mode, with Vue used for front-end development, which is used to build user interfaces and single page applications, and send requests to the back-end to obtain data and perform operations; The backend is developed using Spring Boot, which is used to build Java application frameworks, handle requests sent by the frontend, retrieve data from the database, execute business logic, and return results to the frontend. This combination approach can more flexibly and efficiently build modern web applications. The system also uses sorting algorithms and collaborative filtering algorithms, among which the sorting algorithm can prioritize each added task based on the user’s selection, based on hardware input parameters, and process the process according to the priority order. This can more efficiently complete the processing process and provide users with a platform and application reference for learning integrated circuit related knowledge and communication.
Authors
- T. Chen
- Xueling Zhong (ORCID: https://orcid.org/0000-0002-5702-5837)
- Nan Xie
- Weimin Chen (ORCID: https://orcid.org/0000-0001-9544-172X)
Institutions
- Zhejiang University of Water Resource and Electric Power (CN)
- China Jiliang University (CN)
Publication Details
- Published
- 2024-08-14
- DOI
- https://doi.org/10.1109/peeec63877.2024.00030
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00
Funders
- Zhejiang University