Research on Optimization of Water Conservancy Project Construction Schedule Control Based on Multi-objective Genetic Algorithm
The construction of water conservancy and hydropower projects is highly complex and systematic, significantly contributing to China’s economic growth and social advancement. Within these projects, managing the construction timeline is a crucial aspect of the organizational design, requiring adherence to specific steps and procedures throughout the building process. Control the progress, cost and quality of the project through the process of overall conception, scheme selection, organization and implementation. Considering some uncertain factors in the construction process, this paper studies the construction schedule optimization and control principles of large-scale water conservancy projects, and gives the corresponding optimization and control methods and advanced technical means. Create maximum economic benefits on the premise of ensuring smooth progress and qualified quality. This paper will briefly introduce the application of multi eye algorithm in the uniqueness of optimizing the construction progress of hydraulic engineering is only for reference.
Authors
- Jiayi Huang
Institutions
- Xiamen University of Technology (CN)
Publication Details
- Published
- 2024-08-14
- DOI
- https://doi.org/10.1109/peeec63877.2024.00199
- Citations
- 1
- Primary Topic
- BIM and Construction Integration
- Type
- article
- Field-Weighted Citation Impact
- 0.27