Research on Optimization of Water Conservancy Project Construction Schedule Control Based on Multi-objective Genetic Algorithm

The construction of water conservancy and hydropower projects is highly complex and systematic, significantly contributing to China’s economic growth and social advancement. Within these projects, managing the construction timeline is a crucial aspect of the organizational design, requiring adherence to specific steps and procedures throughout the building process. Control the progress, cost and quality of the project through the process of overall conception, scheme selection, organization and implementation. Considering some uncertain factors in the construction process, this paper studies the construction schedule optimization and control principles of large-scale water conservancy projects, and gives the corresponding optimization and control methods and advanced technical means. Create maximum economic benefits on the premise of ensuring smooth progress and qualified quality. This paper will briefly introduce the application of multi eye algorithm in the uniqueness of optimizing the construction progress of hydraulic engineering is only for reference.

Authors

Institutions

Publication Details

Published
2024-08-14
DOI
https://doi.org/10.1109/peeec63877.2024.00199
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Optimization of Water Conservancy Project Construction Schedule Control Based on Multi-objective Genetic Algorithm

Jiayi Huang
1 citations
BIM and Construction Integration
0.27
article

Research on Optimization of Water Conservancy Project Construction Schedule Control Based on Multi-objective Genetic Algorithm

Jiayi Huang
article en
1 citations

Abstract

The construction of water conservancy and hydropower projects is highly complex and systematic, significantly contributing to China’s economic growth and social advancement. Within these projects, managing the construction timeline is a crucial aspect of the organizational design, requiring adherence to specific steps and procedures throughout the building process. Control the progress, cost and quality of the project through the process of overall conception, scheme selection, organization and implementation. Considering some uncertain factors in the construction process, this paper studies the construction schedule optimization and control principles of large-scale water conservancy projects, and gives the corresponding optimization and control methods and advanced technical means. Create maximum economic benefits on the premise of ensuring smooth progress and qualified quality. This paper will briefly introduce the application of multi eye algorithm in the uniqueness of optimizing the construction progress of hydraulic engineering is only for reference.

Xiamen University of Technology (CN)
Clean water and sanitation
Openalex Percentile: Top 40%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.