The role of the rework cycle from system dynamics modelling for project management: challenges and future research agenda

Purpose This paper aims to contribute to a better understanding of the relationship between the rework cycle with system dynamics (SD) models and the Project Management Institute (PMI) process group. Design/methodology/approach To achieve the aim of this paper, 84 articles that blended SD models and project management (PM) were analysed to identify key variables used in PM modelling. The key variables were utilised to build an extended SD model with multiple rework cycles to explain the link between the rework cycle SD model and PMI process group. Findings The results show that SD might be a favourable approach to capture the reality of the project life cycle when it is extended to represent front-ending, delivery and back-ending. In fact, SD models could potentially be extended to the agile and hybrid methodologies for improving the PM. Research limitations/implications Although this paper provides a better understanding about the extended project life cycle by SD modelling, the results reported herein should be considered in future research that comprises the design of a SD model considering the agile and hybrid methodologies for PM. Practical implications This paper shows how the rework cycle can be applied to the extended project life cycle and the PMI process groups. Additionally, it highlights why SD modelling is a crucial tool for assisting managers with long-term decision-making in PM. Originality/value This study is among the first to explore the integration of rework cycle SD models within the PMI process groups. Specifically, it may prove valuable in supporting decision-making for project managers at each stage of a project’s extended life cycle. As a result, the research also contributes to the ongoing discussion on integrating PM with sustainability and innovation considerations.

Authors

Institutions

Publication Details

Journal
Academia Revista Latinoamericana de Administración
Published
2025-01-16
DOI
https://doi.org/10.1108/arla-03-2022-0063
Citations
4
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
8.43
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The role of the rework cycle from system dynamics modelling for project management: challenges and future research agenda

Milton M. Herrera, Javier Andres Calderon‐Tellez, Gary Bell
4 citations
Academia Revista Latinoamericana de Administración
Construction Project Management and Performance
8.43
article

The role of the rework cycle from system dynamics modelling for project management: challenges and future research agenda

Milton M. Herrera, Javier Andres Calderon‐Tellez, Gary Bell
article en
4 citations

Abstract

Purpose This paper aims to contribute to a better understanding of the relationship between the rework cycle with system dynamics (SD) models and the Project Management Institute (PMI) process group. Design/methodology/approach To achieve the aim of this paper, 84 articles that blended SD models and project management (PM) were analysed to identify key variables used in PM modelling. The key variables were utilised to build an extended SD model with multiple rework cycles to explain the link between the rework cycle SD model and PMI process group. Findings The results show that SD might be a favourable approach to capture the reality of the project life cycle when it is extended to represent front-ending, delivery and back-ending. In fact, SD models could potentially be extended to the agile and hybrid methodologies for improving the PM. Research limitations/implications Although this paper provides a better understanding about the extended project life cycle by SD modelling, the results reported herein should be considered in future research that comprises the design of a SD model considering the agile and hybrid methodologies for PM. Practical implications This paper shows how the rework cycle can be applied to the extended project life cycle and the PMI process groups. Additionally, it highlights why SD modelling is a crucial tool for assisting managers with long-term decision-making in PM. Originality/value This study is among the first to explore the integration of rework cycle SD models within the PMI process groups. Specifically, it may prove valuable in supporting decision-making for project managers at each stage of a project’s extended life cycle. As a result, the research also contributes to the ongoing discussion on integrating PM with sustainability and innovation considerations.

Academia Revista Latinoamericana de AdministraciónVol. 38(1)
University of Sussex (GB), Sussex County Community College (US), Universidad Nacional de Colombia (CO), Military University Nueva Granada (CO)
Openalex Percentile: Top 3%
Construction Project Management and Performance
8.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.