Load adjustable potential assessment method for large industrial users based on decadal time scale
With the rapid development of the power market and the large-scale integration of renewable energy, the load adjustment capacity of the power system has become increasingly important. Large industrial users, as the main load component of the power system, have significant load adjustment potential. This paper proposes a load adjustable potential assessment method for large industrial users based on the decadal time scale. By analyzing various adjustable potential indicators within the decade, the TOPSIS method is used to comprehensively evaluate the load adjustment potential of large industrial users. First, collect historical load data and related environmental data of large industrial users; then, quantify the indicators on the decadal time scale; finally, propose corresponding load adjustment strategy suggestions based on the indicator analysis results. The actual example shows that the evaluation method and indicator system proposed in this paper are reasonable and effective.
Authors
- Jian Cui (ORCID: https://orcid.org/0000-0002-1351-3134)
- Bing Yu (ORCID: https://orcid.org/0000-0002-8761-5192)
- Xiujun Li (ORCID: https://orcid.org/0000-0001-7771-2725)
- Xin Yin (ORCID: https://orcid.org/0000-0001-5974-3990)
- Dunnan Liu (ORCID: https://orcid.org/0000-0002-2155-8359)
- Changsheng Su
- Zhenyu Ma
- Ao Li (ORCID: https://orcid.org/0000-0002-8866-2302)
- Zihao Wang (ORCID: https://orcid.org/0000-0003-1071-6275)
- Yichi Zhang (ORCID: https://orcid.org/0000-0002-7160-8430)
Institutions
- North China Electric Power University (CN)
- Inner Mongolia Electric Power (China) (CN)
- State Power Investment Corporation (China) (CN)
Publication Details
- Published
- 2025-01-16
- DOI
- https://doi.org/10.1117/12.3044971
- Citations
- 1
- Primary Topic
- Elevator Systems and Control
- Type
- article
- Field-Weighted Citation Impact
- 1.21