Comprehensive advanced geological prediction technology and application of tunnels

In order to better carry out railway construction in the western region and avoid safety problems caused by adverse geological disasters during tunnel excavation, advance geological forecast research and analysis is carried out. In view of the problem of insufficient accuracy of a single advanced geological forecasting method, the advantages, disadvantages and applicability of the current main advanced geological forecasting methods are compared. Propose a comprehensive advanced geological forecast implementation plan that combines multiple methods and complements multiple physical property parameters. Taking the advanced geological prediction project of a certain railway tunnel as an example. Based on the geological survey method, tunnel face geological sketching method, blasting source method and other forecasting methods, the on-site excavation face was monitored, the development of joint fissure water in front of the tunnel face was successfully predicted, and the surrounding rock grade and support grade were adjusted in a timely manner. Facts have proved that the combined forecasting of multiple methods has greatly improved the accuracy of advance forecasting of poor geology during team road construction.

Authors

Institutions

Publication Details

Published
2025-01-16
DOI
https://doi.org/10.1117/12.3045226
Citations
1
Primary Topic
Geoscience and Mining Technology
Type
article
Field-Weighted Citation Impact
1.30
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comprehensive advanced geological prediction technology and application of tunnels

Xian Cui, Pengpeng Zhao, Bin Liu, Jin Wang et al.
1 citations
Geoscience and Mining Technology
1.30
article

Comprehensive advanced geological prediction technology and application of tunnels

Xian Cui, Pengpeng Zhao, Bin Liu, Jin Wang, Chao Liu, Hongru Wang
article en
1 citations

Abstract

In order to better carry out railway construction in the western region and avoid safety problems caused by adverse geological disasters during tunnel excavation, advance geological forecast research and analysis is carried out. In view of the problem of insufficient accuracy of a single advanced geological forecasting method, the advantages, disadvantages and applicability of the current main advanced geological forecasting methods are compared. Propose a comprehensive advanced geological forecast implementation plan that combines multiple methods and complements multiple physical property parameters. Taking the advanced geological prediction project of a certain railway tunnel as an example. Based on the geological survey method, tunnel face geological sketching method, blasting source method and other forecasting methods, the on-site excavation face was monitored, the development of joint fissure water in front of the tunnel face was successfully predicted, and the surrounding rock grade and support grade were adjusted in a timely manner. Facts have proved that the combined forecasting of multiple methods has greatly improved the accuracy of advance forecasting of poor geology during team road construction.

China Aerospace Science and Technology Corporation (CN), China State Construction Engineering (China) (CN)
Openalex Percentile: Top 25%
Geoscience and Mining Technology
1.30
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Comprehensive advanced geological prediction technology and application of tunnels — Xian Cui, Pengpeng Zhao, et al. · (2025) | TGRS Research Map | TGRS