Scheduling optimization based on assessment of adjustable potential of large-scale industrial loads

As clean energy generation grows, power systems require greater flexibility to ensure safe operation. As a critical emerging entity that assists the power grid in balancing peak and valley load fluctuations, virtual power plants can provide flexible real-time power through demand response and coordinate reasonable dispatch responses among all participants to alleviate the contradiction between supply and demand during peak electricity consumption periods. Large industrial loads have the characteristics of a large load base. Currently, there is a lack of research on accurately analyzing the adjustable potential of power users in large industrial industries and then integrating them into virtual power plant operation dispatching. This paper introduces a multi-time-scale demand response assessment method, analyzes the response load characteristics of the steel and electrolytic aluminium industries, and proposes an optimal dispatch method based on assessing the adjustable potential of large industrial loads to optimize the load aggregator's cost benefits. Taking maximization as the goal, taking the data of Xinjiang Province as an example, the planning declaration curve of a large industrial load is solved, and the economic dispatch of a large industrial load is realized.

Authors

Institutions

Publication Details

Published
2025-01-16
DOI
https://doi.org/10.1117/12.3044959
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Scheduling optimization based on assessment of adjustable potential of large-scale industrial loads

Xin-Yu Xu, Jian Cui, Zuhan Zhang, Liang Tang et al.
1 links
Scheduling and Optimization Algorithms
article

Scheduling optimization based on assessment of adjustable potential of large-scale industrial loads

Xin-Yu Xu, Jian Cui, Zuhan Zhang, Liang Tang, Changsheng Su, Zhenyu Ma, Yichi Zhang, Xiujun Li, Dunnan Liu
article en

Abstract

As clean energy generation grows, power systems require greater flexibility to ensure safe operation. As a critical emerging entity that assists the power grid in balancing peak and valley load fluctuations, virtual power plants can provide flexible real-time power through demand response and coordinate reasonable dispatch responses among all participants to alleviate the contradiction between supply and demand during peak electricity consumption periods. Large industrial loads have the characteristics of a large load base. Currently, there is a lack of research on accurately analyzing the adjustable potential of power users in large industrial industries and then integrating them into virtual power plant operation dispatching. This paper introduces a multi-time-scale demand response assessment method, analyzes the response load characteristics of the steel and electrolytic aluminium industries, and proposes an optimal dispatch method based on assessing the adjustable potential of large industrial loads to optimize the load aggregator's cost benefits. Taking maximization as the goal, taking the data of Xinjiang Province as an example, the planning declaration curve of a large industrial load is solved, and the economic dispatch of a large industrial load is realized.

North China Electric Power University (CN), Inner Mongolia Electric Power (China) (CN), State Power Investment Corporation (China) (CN)
Openalex Percentile: Top 99%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Scheduling optimization based on assessment of adjustable potential of large-scale industrial loads — Xin-Yu Xu, Jian Cui, et al. · (2025) | TGRS Research Map | TGRS