Stochastic Optimal Scheduling Study of Virtual Power Plant Based on Multiple Distributed Resources

In the realm of distributed energy operation research, the virtual power plant emerges as a potent strategy to account for system uncertainties and enhance profits for all stakeholders. This paper considers uncertainties related to cybersecurity constraints, electrical and thermal loads, wind speed variations, and market tariff fluctuations. Subsequently, the optimal scheduling challenge for a virtual power plant incorporating multiple distributed resources is formulated utilizing the Generalized Algebraic Modeling System (GAMS) within the IEEE 33 Bus Distributed Test System, and is resolved through the CLPEX solver. Simulation outcomes reveal that the integration of a photovoltaic solar thermal system bolsters the expected profitability of the system and diminishes the virtual power plant's reliance on boilers and cogeneration units.

Authors

Institutions

Publication Details

Published
2024-09-23
DOI
https://doi.org/10.1109/icedcs64328.2024.00189
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Stochastic Optimal Scheduling Study of Virtual Power Plant Based on Multiple Distributed Resources

Wenchuan Meng, Zaimin Yang, Jianbin Lu, Shuai Han et al.
Smart Grid Energy Management
article

Stochastic Optimal Scheduling Study of Virtual Power Plant Based on Multiple Distributed Resources

Wenchuan Meng, Zaimin Yang, Jianbin Lu, Shuai Han, Siyang Sun, Ning Wu
article en

Abstract

In the realm of distributed energy operation research, the virtual power plant emerges as a potent strategy to account for system uncertainties and enhance profits for all stakeholders. This paper considers uncertainties related to cybersecurity constraints, electrical and thermal loads, wind speed variations, and market tariff fluctuations. Subsequently, the optimal scheduling challenge for a virtual power plant incorporating multiple distributed resources is formulated utilizing the Generalized Algebraic Modeling System (GAMS) within the IEEE 33 Bus Distributed Test System, and is resolved through the CLPEX solver. Simulation outcomes reveal that the integration of a photovoltaic solar thermal system bolsters the expected profitability of the system and diminishes the virtual power plant's reliance on boilers and cogeneration units.

China Southern Power Grid (China) (CN)
China Southern Power Grid
Openalex Percentile: Top 76%
Smart Grid Energy Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.