Research on optimization function of digital power supply system construction

With the continuous development of the power system, the existing digital power supply system can not meet the application demand. It is necessary to improve from the aspects of business details, functional requirements, convenient operation and basic structure based on the business needs of each township power supply office. Digital transformation needs to be implemented. We need to formulate relevant functional optimization construction requirements. The system functions mainly include management workbench, work order center, asset center, office management, toolbox management and mobile application module. The updated function can solve the practical problems of multiple system switching repeatedly, the omission of field business management, the technical shortcomings of implementers and the complicated entry of work orders. The service quality and efficiency of power supply business personnel and equipment management level can be improved. It can provide digital management means for power supply. The digital transformation of power supply stations has been accelerated. The power supply service capacity can also be comprehensively improved.

Authors

Publication Details

Published
2024-09-23
DOI
https://doi.org/10.1109/icedcs64328.2024.00039
Primary Topic
Energy and Environment Impacts
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on optimization function of digital power supply system construction

Yan Furong, Hongbo Guo, Jing Zhang, Yan Chen et al.
Energy and Environment Impacts
article

Research on optimization function of digital power supply system construction

Yan Furong, Hongbo Guo, Jing Zhang, Yan Chen, Junling Liu, Wan Quan
article en

Abstract

With the continuous development of the power system, the existing digital power supply system can not meet the application demand. It is necessary to improve from the aspects of business details, functional requirements, convenient operation and basic structure based on the business needs of each township power supply office. Digital transformation needs to be implemented. We need to formulate relevant functional optimization construction requirements. The system functions mainly include management workbench, work order center, asset center, office management, toolbox management and mobile application module. The updated function can solve the practical problems of multiple system switching repeatedly, the omission of field business management, the technical shortcomings of implementers and the complicated entry of work orders. The service quality and efficiency of power supply business personnel and equipment management level can be improved. It can provide digital management means for power supply. The digital transformation of power supply stations has been accelerated. The power supply service capacity can also be comprehensively improved.

Affordable and clean energy
Openalex Percentile: Top 85%
Energy and Environment Impacts
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.