Research on optimization function of digital power supply system construction
With the continuous development of the power system, the existing digital power supply system can not meet the application demand. It is necessary to improve from the aspects of business details, functional requirements, convenient operation and basic structure based on the business needs of each township power supply office. Digital transformation needs to be implemented. We need to formulate relevant functional optimization construction requirements. The system functions mainly include management workbench, work order center, asset center, office management, toolbox management and mobile application module. The updated function can solve the practical problems of multiple system switching repeatedly, the omission of field business management, the technical shortcomings of implementers and the complicated entry of work orders. The service quality and efficiency of power supply business personnel and equipment management level can be improved. It can provide digital management means for power supply. The digital transformation of power supply stations has been accelerated. The power supply service capacity can also be comprehensively improved.
Authors
- Yan Furong
- Hongbo Guo (ORCID: https://orcid.org/0009-0006-7669-7723)
- Jing Zhang (ORCID: https://orcid.org/0009-0007-9740-9193)
- Yan Chen (ORCID: https://orcid.org/0000-0003-0409-9485)
- Junling Liu (ORCID: https://orcid.org/0000-0002-6492-3408)
- Wan Quan
Publication Details
- Published
- 2024-09-23
- DOI
- https://doi.org/10.1109/icedcs64328.2024.00039
- Primary Topic
- Energy and Environment Impacts
- Type
- article
- Field-Weighted Citation Impact
- 0.00