Meta-Heuristic Approaches to NP-Hard Resource Allocation in Civil Engineering: DE vs GA
In civil engineering, resource allocation refers to how best to divide resources including labor, supplies, and machinery among different jobs in building projects. This distribution is critical to meeting project deadlines, cutting expenses, and improving project efficiency. Because it is combinatorial in nature and has many constraints, resource allocation in civil engineering is categorized as NP-hard. According to the theory of NP-hardness, as a problem gets complex, it becomes computationally impossible to find an exact optimal solution in a reasonable amount of time. The complexity and uncertainty included in civil engineering projects, make traditional methods such as deterministic algorithms and linear programming unsuitable for tackling resource allocation challenges. By utilizing iterative optimization strategies motivated by mathematical models or natural processes, meta-heuristic algorithms offer a strong substitute. The capacity of meta-heuristic techniques to navigate large solution spaces and adjust to changing project restrictions and goals makes them especially well-suited for resource allocation in the civil engineering field. GA and DE are able to effectively explore and exploit solutions that standard algorithms could take longer to find in realistic timeframes by modeling biological evolution or natural selection mechanisms.In this work, this paper access and contrast Differential Evolution (DE) and Genetic Algorithm(GA) for their respective roles in resource allocation optimization in civil engineering applications. This work show through rigorous experimentation and research that Differential Evolution performs better than Genetic Algorithm in terms of convergence speed and solution quality. The study offers significant contributions to the field of civil engineering resource allocation by providing useful insights into the application of meta-heuristic methodologies. This research is expected to have a positive impact on stakeholders, engineers, and project managers, who are working on construction projects.
Authors
- Rashmi Benni
- G K Akshata
- C T Neelamma
Institutions
- KLE Technological University (IN)
Publication Details
- Published
- 2024-10-25
- DOI
- https://doi.org/10.1109/icisaa62385.2024.10829356
- Primary Topic
- Advanced Manufacturing and Logistics Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00