Design and implementation of true type test platform in low-voltage electric distribution area
In order to study the operation characteristics of the electric distribution area in modern smart electric distribution network, improve the reliability and power quality of the area, and promote the construction of intelligent distribution area, an AC-DC hybrid low-voltage distribution area true mode test platform is proposed in this paper, which can realize a comprehensive true mode simulation of the operation scene of low-voltage distribution area. This paper first analyzes the system composition and implementation method of the true type experimental platform, and then designs typical test scenarios such as key equipment detection, transparent perception and power quality control of the platform. The true type test platform in the low-voltage distribution area can provide a test environment for the verification of new equipment and new technologies in the distribution area, help improve the reliability and power quality of the distribution area, and provide support for the construction of modern smart electric distribution network.
Authors
- Julong Chen (ORCID: https://orcid.org/0000-0001-5270-4104)
- Jian Wu (ORCID: https://orcid.org/0000-0003-2308-9207)
- Yu Zhang (ORCID: https://orcid.org/0000-0002-9736-8244)
- Qingsheng Li
- Jierui Yang
Institutions
- Guizhou University (CN)
- Guizhou Electric Power Design and Research Institute (CN)
Publication Details
- Published
- 2024-10-23
- DOI
- https://doi.org/10.1109/iccasit62299.2024.10827968
- Primary Topic
- Smart Grid and Power Systems
- Type
- article
- Field-Weighted Citation Impact
- 0.00