Project Finance and Asset Management for Electric Transmission Lines in Peru

This paper is focused on the technical, regulatory, and financial evaluation of the electricity transmission service that a company can provide to an electricity generation company for the electric transmission lines services for a period of 30 years. The analysis includes the regulatory context and the role that each regulatory institution plays when evaluating a project of this large scale. This paper also describes asset management practices for the transmission lines that need to be considered when contracting the electricity transmission service. This paper additionally entails the regulatory frame for a hydroelectric power plant in Peru and the economic, technical, and financial factors that the company needs to consider when they want to connect their plant to a substation in the National Interconnected Electrical System (SEIN).

Authors

Institutions

Publication Details

Published
2024-11-06
DOI
https://doi.org/10.1109/intercon63140.2024.10833506
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Project Finance and Asset Management for Electric Transmission Lines in Peru

Brenda Zavala
Construction Project Management and Performance
article

Project Finance and Asset Management for Electric Transmission Lines in Peru

Brenda Zavala
article en

Abstract

This paper is focused on the technical, regulatory, and financial evaluation of the electricity transmission service that a company can provide to an electricity generation company for the electric transmission lines services for a period of 30 years. The analysis includes the regulatory context and the role that each regulatory institution plays when evaluating a project of this large scale. This paper also describes asset management practices for the transmission lines that need to be considered when contracting the electricity transmission service. This paper additionally entails the regulatory frame for a hydroelectric power plant in Peru and the economic, technical, and financial factors that the company needs to consider when they want to connect their plant to a substation in the National Interconnected Electrical System (SEIN).

IEEE Industry Applications Society (US)
Openalex Percentile: Top 69%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.