Assessment of reliability parameters of in-plant power supply schemes with two-transformer substations

In the process of designing in-plant power supply systems, it is necessary to determine their rational redundancy. The reliability of the power supply system has been established for the following variants of the circuit of two-transformer 10/0.4 kV substations: without redundancy; with redundancy (when installing a sectional switch); with double redundancy (when installing a sectional switch and a backup jumper for 0.4 kV). The calculation data have shown that the reliability of the circuit without redundancy is 1.87 times lower compared to the circuit with redundancy and 3.17 times lower than with the circuit with double redundancy. Graphic dependencies of the mean time between failures of power supply circuits with two-transformer substations from different rated capacities of shop transformers have been obtained for three variants: without redundancy; with redundancy; with double redundancy. The optimal condition is to use a smaller number of transformer substations (respectively, transformers) while maintaining the load factor of 0.8. When comparing the graphs, it has been found that the longest mean time between failures is achieved with double redundancy, and the shortest – with no redundancy. The research results can be recommended for use in the process of designing in-plant power supply systems to assess and improve the reliability and efficiency of equipment operation

Authors

Institutions

Publication Details

Journal
Vestnik MGTU
Published
2024-12-24
DOI
https://doi.org/10.21443/1560-9278-2024-27-4-521-533
Citations
1
Primary Topic
Diverse Industrial Engineering Technologies
Type
article
Field-Weighted Citation Impact
0.35
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessment of reliability parameters of in-plant power supply schemes with two-transformer substations

R. M. Petrova, Elena Gracheva
1 citations
Vestnik MGTU
Diverse Industrial Engineering Technologies
0.35
article

Assessment of reliability parameters of in-plant power supply schemes with two-transformer substations

R. M. Petrova, Elena Gracheva
article en
1 citations

Abstract

In the process of designing in-plant power supply systems, it is necessary to determine their rational redundancy. The reliability of the power supply system has been established for the following variants of the circuit of two-transformer 10/0.4 kV substations: without redundancy; with redundancy (when installing a sectional switch); with double redundancy (when installing a sectional switch and a backup jumper for 0.4 kV). The calculation data have shown that the reliability of the circuit without redundancy is 1.87 times lower compared to the circuit with redundancy and 3.17 times lower than with the circuit with double redundancy. Graphic dependencies of the mean time between failures of power supply circuits with two-transformer substations from different rated capacities of shop transformers have been obtained for three variants: without redundancy; with redundancy; with double redundancy. The optimal condition is to use a smaller number of transformer substations (respectively, transformers) while maintaining the load factor of 0.8. When comparing the graphs, it has been found that the longest mean time between failures is achieved with double redundancy, and the shortest – with no redundancy. The research results can be recommended for use in the process of designing in-plant power supply systems to assess and improve the reliability and efficiency of equipment operation

Vestnik MGTUVol. 27(4)
Kazan State Power Engineering University (RU)
Openalex Percentile: Top 31%
Diverse Industrial Engineering Technologies
0.35
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Assessment of reliability parameters of in-plant power supply schemes with two-transformer substations — R. M. Petrova, Elena Gracheva · Vestnik MGTU (2024) | TGRS Research Map | TGRS