Desenvolvimento e homologação de ferramentas de limpeza e inspeção interna para o sistema integrado de escoamento de gás do Pré-sal da Bacia de Santos

The internal inspection of the Rota 1, 2, and 3 gas pipelines is considered a technological milestone for deepwater exploration. The challenge of developing cleaning and inspection PIGs involved pipelines with a large variation in diameter, ranging from 18 to 24 inches, long distances of up to 450 kilometers, high operating pressures of up to 250 kgf/cm², water depths of up to 2400 meters, and passage through equipment with complex geometries. The risk of this operation, in terms of the possibility of PIGs getting stuck, was considered medium/high. To reduce this risk, a phase of tool homologation was planned. After a thorough verification of the documentation of the subsea system components, the minimum tests necessary to assess the operational performance of the tools in scenarios of high pressure exposure, displacement at low flow rates, detection of anomalies at high speeds, and durability/wear over long distances were defined. At the end of the homologation phase, full-scale tests were carried out in a circuit containing 51 components that represented the restrictive geometries of the subsea system. Another measure taken was the use of radioactive isotope transmitters, increasing the autonomy in case the PIG needed to be located. So far, 03 out of 04 pipelines have been inspected with these tools.

Authors

Institutions

Publication Details

Journal
Revista Técnica da Universidade Petrobras.
Published
2024-12-23
DOI
https://doi.org/10.70369/a55jje17
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Desenvolvimento e homologação de ferramentas de limpeza e inspeção interna para o sistema integrado de escoamento de gás do Pré-sal da Bacia de Santos

Marcos Oliveira, Emília Pereira da Silva, Ranieri Ambrosio Merini, Gustavo Carvalheira Mazzei et al.
Revista Técnica da Universidade Petrobras.
Offshore Engineering and Technologies
article

Desenvolvimento e homologação de ferramentas de limpeza e inspeção interna para o sistema integrado de escoamento de gás do Pré-sal da Bacia de Santos

Marcos Oliveira, Emília Pereira da Silva, Ranieri Ambrosio Merini, Gustavo Carvalheira Mazzei, Luciano Baptista, Wagner Pereira Mendes de Castro
article en

Abstract

The internal inspection of the Rota 1, 2, and 3 gas pipelines is considered a technological milestone for deepwater exploration. The challenge of developing cleaning and inspection PIGs involved pipelines with a large variation in diameter, ranging from 18 to 24 inches, long distances of up to 450 kilometers, high operating pressures of up to 250 kgf/cm², water depths of up to 2400 meters, and passage through equipment with complex geometries. The risk of this operation, in terms of the possibility of PIGs getting stuck, was considered medium/high. To reduce this risk, a phase of tool homologation was planned. After a thorough verification of the documentation of the subsea system components, the minimum tests necessary to assess the operational performance of the tools in scenarios of high pressure exposure, displacement at low flow rates, detection of anomalies at high speeds, and durability/wear over long distances were defined. At the end of the homologation phase, full-scale tests were carried out in a circuit containing 51 components that represented the restrictive geometries of the subsea system. Another measure taken was the use of radioactive isotope transmitters, increasing the autonomy in case the PIG needed to be located. So far, 03 out of 04 pipelines have been inspected with these tools.

Revista Técnica da Universidade Petrobras.(2)
Petrobras (Brazil) (BR)
Clean water and sanitation
Openalex Percentile: Top 66%
Offshore Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Desenvolvimento e homologação de ferramentas de limpeza e inspeção interna para o sistema integrado de escoamento de gás do Pré-sal da Bacia de Santos — Marcos Oliveira, Emília Pereira da Silva, et al. · Revista Técnica da Universidade Petrobras. (2024) | TGRS Research Map | TGRS