Advanced construction site layout planning for prefabricated projects: an application of the new algorithm

Purpose This study aims to optimize the construction site layout planning (CSLP) problem, with a focus on prefabricated projects. It proposes the use of the oMOAHA algorithm, an enhanced version of the multi-objective artificial hummingbird algorithm (MOAHA), to address challenges related to search space exploration and local optimization in CSLP. Design/methodology/approach The study integrates three techniques – opposition-based learning (OBL), quasi-opposition and quasi-reflection – into the initialization phase of the MOAHA algorithm, creating the oMOAHA variant. This model is applied to all three types of CSLP problems – pre-determined location, grid system and continuous space – to evaluate its effectiveness. Six objective functions (three related to cost, two to safety and one to tower crane efficiency) and four site-related constraints are considered through three case studies taken from previous research and one real project involving prefabricated steel structures. Findings The oMOAHA algorithm demonstrates superior performance compared to previous models, consistently outperforming traditional approaches in CSLP optimization for prefabricated projects. In the real case study, the proposed model exceeded the actual project plan by 28–43%, indicating its potential to significantly improve both solution quality and project outcomes. Originality/value This study is the first to apply an optimization model to all three types of CSLP problems – pre-determined location, grid system and continuous space – within a unified framework. The integration of advanced techniques into the MOAHA algorithm and the model’s successful application in a real prefabricated project underscore its high applicability and effectiveness in modern construction management.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2025-01-10
DOI
https://doi.org/10.1108/ecam-05-2024-0676
Citations
6
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
6.04
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Advanced construction site layout planning for prefabricated projects: an application of the new algorithm

Vu Hong Son Pham, Duy Hoang Pham
6 citations
Engineering Construction & Architectural Management
BIM and Construction Integration
6.04
article

Advanced construction site layout planning for prefabricated projects: an application of the new algorithm

Vu Hong Son Pham, Duy Hoang Pham
article en
6 citations

Abstract

Purpose This study aims to optimize the construction site layout planning (CSLP) problem, with a focus on prefabricated projects. It proposes the use of the oMOAHA algorithm, an enhanced version of the multi-objective artificial hummingbird algorithm (MOAHA), to address challenges related to search space exploration and local optimization in CSLP. Design/methodology/approach The study integrates three techniques – opposition-based learning (OBL), quasi-opposition and quasi-reflection – into the initialization phase of the MOAHA algorithm, creating the oMOAHA variant. This model is applied to all three types of CSLP problems – pre-determined location, grid system and continuous space – to evaluate its effectiveness. Six objective functions (three related to cost, two to safety and one to tower crane efficiency) and four site-related constraints are considered through three case studies taken from previous research and one real project involving prefabricated steel structures. Findings The oMOAHA algorithm demonstrates superior performance compared to previous models, consistently outperforming traditional approaches in CSLP optimization for prefabricated projects. In the real case study, the proposed model exceeded the actual project plan by 28–43%, indicating its potential to significantly improve both solution quality and project outcomes. Originality/value This study is the first to apply an optimization model to all three types of CSLP problems – pre-determined location, grid system and continuous space – within a unified framework. The integration of advanced techniques into the MOAHA algorithm and the model’s successful application in a real prefabricated project underscore its high applicability and effectiveness in modern construction management.

Engineering Construction & Architectural ManagementVol. 33(3)
Vietnam National University Ho Chi Minh City (VN), Ho Chi Minh City University of Technology (VN)
Openalex Percentile: Top 5%
BIM and Construction Integration
6.04
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Advanced construction site layout planning for prefabricated projects: an application of the new algorithm — Vu Hong Son Pham, Duy Hoang Pham · Engineering Construction & Architectural Management (2025) | TGRS Research Map | TGRS