Human Resource Allocation for Parallel Assembly Processes with Temporal and Spatial Constraints

Human resource allocation in parallel assembly processes (PAPs) is an important optimization problem. It can be regarded as a resource-constrained project scheduling problem with specific constraints. In this paper, a mixed-integer programming (MIP) model is established for it to minimize the maximum completion time (i.e., makespan) by comprehensively analyzing the characteristics of a PAP, including temporal constraints: worker periodic unavailability and the tail time of operations; and spatial constraints: workstation and human resource constraints. To address this problem, a heuristic rule for prioritizing idle workers that considers the precedence relationships of operations is designed as a baseline method, and an iterative greedy algorithm is further proposed to provide high-performance solutions. These methods aim to shorten the cycle and costs of a PAP. The effectiveness of the proposed algorithms is validated through extensive experiments.

Authors

Institutions

Publication Details

Published
2024-10-18
DOI
https://doi.org/10.1109/icnsc62968.2024.10760067
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Human Resource Allocation for Parallel Assembly Processes with Temporal and Spatial Constraints

Shengchao Li, Xiaoqing Liu, Shixin Liu, Weihua Deng
Manufacturing Process and Optimization
article

Human Resource Allocation for Parallel Assembly Processes with Temporal and Spatial Constraints

Shengchao Li, Xiaoqing Liu, Shixin Liu, Weihua Deng
article en

Abstract

Human resource allocation in parallel assembly processes (PAPs) is an important optimization problem. It can be regarded as a resource-constrained project scheduling problem with specific constraints. In this paper, a mixed-integer programming (MIP) model is established for it to minimize the maximum completion time (i.e., makespan) by comprehensively analyzing the characteristics of a PAP, including temporal constraints: worker periodic unavailability and the tail time of operations; and spatial constraints: workstation and human resource constraints. To address this problem, a heuristic rule for prioritizing idle workers that considers the precedence relationships of operations is designed as a baseline method, and an iterative greedy algorithm is further proposed to provide high-performance solutions. These methods aim to shorten the cycle and costs of a PAP. The effectiveness of the proposed algorithms is validated through extensive experiments.

Northeastern University (CN)
Openalex Percentile: Top 62%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.