Risk Assessment and Control Method for High Load Transmission Lines Based on Feasible Control Domain

In the risk assessment of power system lines, the probability and severity of risk occurrence are two important indicators for measuring operational safety. In order to increase the reliability of high load operation of power lines, the risk of voltage and power exceeding limits during line operation is calculated and analyzed, and the power grid is scheduled and controlled under reliability requirements. This article proposes a risk assessment and control method for high load transmission lines based on feasible control domains. The developed risk assessment model comprehensively takes into account the likelihood and potential impact of load fluctuations. The simulation analysis of the IEEE33 bus system shows that the increase in load will affect the risk index of line overload. Based on risk assessment in the feasible control domain, controlling the line can improve the stability of the system and increase the safety of the power system.

Authors

Institutions

Publication Details

Published
2024-09-20
DOI
https://doi.org/10.1109/icpre62586.2024.10768639
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk Assessment and Control Method for High Load Transmission Lines Based on Feasible Control Domain

Jianqiao Ye, Congtie Li, Zhiming Shen, Yuanming Sun et al.
High-Voltage Power Transmission Systems
article

Risk Assessment and Control Method for High Load Transmission Lines Based on Feasible Control Domain

Jianqiao Ye, Congtie Li, Zhiming Shen, Yuanming Sun, Ting Yang, Jian-Fang Hu, Junyuan Tan
article en

Abstract

In the risk assessment of power system lines, the probability and severity of risk occurrence are two important indicators for measuring operational safety. In order to increase the reliability of high load operation of power lines, the risk of voltage and power exceeding limits during line operation is calculated and analyzed, and the power grid is scheduled and controlled under reliability requirements. This article proposes a risk assessment and control method for high load transmission lines based on feasible control domains. The developed risk assessment model comprehensively takes into account the likelihood and potential impact of load fluctuations. The simulation analysis of the IEEE33 bus system shows that the increase in load will affect the risk index of line overload. Based on risk assessment in the feasible control domain, controlling the line can improve the stability of the system and increase the safety of the power system.

China Southern Power Grid (China) (CN)
China Southern Power Grid
Openalex Percentile: Top 77%
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.