Methodology for the Integration and Validation of Multi-Vendor IEDs Using IEC61850 Protocol

The article presents the integration and coordination of protection and communication between multi-vendor IEDs within an electrical distribution system. The study focuses on the 22kV side of Substation Number Four (4) in Cuenca-Ecuador, incorporating SIEMENS and SCHNEIDER brand IEDs configured for overcurrent protection. Three flowcharts were developed to implement GOOSE, SV and MMS communication according to the IEC61850 standard. These diagrams guide the integration of IEDs from multiple manufactures, ensuring inter-operability and efficient communication. Communication signals were sent to a Remote Terminal Unit (RTU) for centralized monitoring, with SCADA interfaces designed for a complete visualization of the data. Extensive tests were carried out using the Omicron CMC356 equipment, validating the settings and flowcharts on the IEDs. The results confirmed the successful coordination and communication between the protection devices, demonstrating the robustness and reliability of the proposed integration methodology. This study highlights the feasibility and benefits of using the IEC61850 standard for the integration of multi-vendor IEDs in the automation of modern electrical power systems.

Authors

Institutions

Publication Details

Published
2024-11-06
DOI
https://doi.org/10.1109/pepsc63375.2024.10823545
Primary Topic
Flexible and Reconfigurable Manufacturing Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Methodology for the Integration and Validation of Multi-Vendor IEDs Using IEC61850 Protocol

Flavio Quizhpi-Palomeque, Mateo Quizhpi-Cuesta, Antony Jácome-Barrionuevo
Flexible and Reconfigurable Manufacturing Systems
article

Methodology for the Integration and Validation of Multi-Vendor IEDs Using IEC61850 Protocol

Flavio Quizhpi-Palomeque, Mateo Quizhpi-Cuesta, Antony Jácome-Barrionuevo
article en

Abstract

The article presents the integration and coordination of protection and communication between multi-vendor IEDs within an electrical distribution system. The study focuses on the 22kV side of Substation Number Four (4) in Cuenca-Ecuador, incorporating SIEMENS and SCHNEIDER brand IEDs configured for overcurrent protection. Three flowcharts were developed to implement GOOSE, SV and MMS communication according to the IEC61850 standard. These diagrams guide the integration of IEDs from multiple manufactures, ensuring inter-operability and efficient communication. Communication signals were sent to a Remote Terminal Unit (RTU) for centralized monitoring, with SCADA interfaces designed for a complete visualization of the data. Extensive tests were carried out using the Omicron CMC356 equipment, validating the settings and flowcharts on the IEDs. The results confirmed the successful coordination and communication between the protection devices, demonstrating the robustness and reliability of the proposed integration methodology. This study highlights the feasibility and benefits of using the IEC61850 standard for the integration of multi-vendor IEDs in the automation of modern electrical power systems.

Politecnica Salesiana University (EC)
Openalex Percentile: Top 63%
Flexible and Reconfigurable Manufacturing Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Methodology for the Integration and Validation of Multi-Vendor IEDs Using IEC61850 Protocol — Flavio Quizhpi-Palomeque, Mateo Quizhpi-Cuesta, et al. · (2024) | TGRS Research Map | TGRS