OPTIMIZATION OF NEW CONSTRUCTIVE HEURISTIC ALGORITHMS FOR PERMUTATION FLOW SHOP SCHEDULING PROBLEM

This paper presents a new heuristic designed specifically for minimizing makespan in scheduling problems. The proposed approach incorporates a dual bottleneck phase combined with a pre-initial arrangement to enhance optimization of new heuristic. By introducing both major and minor bottleneck identification phases, the heuristic effectively identifies critical processing machines with significant completion times. To evaluate the performance, this study employed the Taillard benchmark and the upper bound (UB) makespan as comparative tools, assessing the new heuristic against the well-known NEH heuristic. Computational results clearly demonstrate that the new heuristic significantly outperforms the NEH heuristic in reducing the total completion time. The consistent lower RPD values and negative percentage errors indicate that ICHA is more effective in approaching the optimal makespan as indicated by the Taillard UB.

Authors

Institutions

Publication Details

Journal
Journal of Information System and Technology Management
Published
2024-12-24
DOI
https://doi.org/10.35631/jistm.937016
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

OPTIMIZATION OF NEW CONSTRUCTIVE HEURISTIC ALGORITHMS FOR PERMUTATION FLOW SHOP SCHEDULING PROBLEM

Azli Nawawi, Noor Azizah Sidek, N.A. Isa, Salleh Ahmad Bareduan et al.
Journal of Information System and Technology Management
Advanced Manufacturing and Logistics Optimization
article

OPTIMIZATION OF NEW CONSTRUCTIVE HEURISTIC ALGORITHMS FOR PERMUTATION FLOW SHOP SCHEDULING PROBLEM

Azli Nawawi, Noor Azizah Sidek, N.A. Isa, Salleh Ahmad Bareduan, Muhammad Marsudi
article en

Abstract

This paper presents a new heuristic designed specifically for minimizing makespan in scheduling problems. The proposed approach incorporates a dual bottleneck phase combined with a pre-initial arrangement to enhance optimization of new heuristic. By introducing both major and minor bottleneck identification phases, the heuristic effectively identifies critical processing machines with significant completion times. To evaluate the performance, this study employed the Taillard benchmark and the upper bound (UB) makespan as comparative tools, assessing the new heuristic against the well-known NEH heuristic. Computational results clearly demonstrate that the new heuristic significantly outperforms the NEH heuristic in reducing the total completion time. The consistent lower RPD values and negative percentage errors indicate that ICHA is more effective in approaching the optimal makespan as indicated by the Taillard UB.

Journal of Information System and Technology ManagementVol. 9(37)
Universitas Islam Kalimantan Muhammad Arsyad Al Banjary (ID), Tun Hussein Onn University of Malaysia (MY)
Universiti Tun Hussein Onn Malaysia
Openalex Percentile: Top 63%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

OPTIMIZATION OF NEW CONSTRUCTIVE HEURISTIC ALGORITHMS FOR PERMUTATION FLOW SHOP SCHEDULING PROBLEM — Azli Nawawi, Noor Azizah Sidek, et al. · Journal of Information System and Technology Management (2024) | TGRS Research Map | TGRS