COMPREHENSIVE ASSESSMENT OF THE WORK VOLUME IMPLEMENTED IN CONTRACTING FACILITIES

The publication reflects the experience of applying the methodology for assessing the earned value of projects. It is concluded that a scientifically based project management system, including monitoring the earned value, can improve the efficiency of project implementation. The article examines the results of the activities of a contracting organization providing housing construction in Minsk (Republic of Belarus). It is revealed that a systemic problem is the violation of construction deadlines and costs. At the same time, strict cost control leads to the fact that cost deviations do not exceed 2%, and deadline deviations are more than 20%. A conclusion is made about the need to use a comprehensive indicator for assessing the earned value, ensuring monitoring not only the construction cost indicator, but also non-cost indicators: the number of works, their labor intensity and construction period. Using a specific construction project as an example, the progress of contract work is analyzed. The advantages of assessing the earned value of contract work are clearly demonstrated, taking into account a comprehensive assessment of the number of works, their cost, and construction periods. A calculation is made of the reduction in the efficiency of construction activities with an increase in construction periods. The author's scientific contribution consists in developing a methodology for a comprehensive assessment of the developed volume of contract work. The methodology allows not only to monitor the construction progress, identify deviations from the work schedule, but also to assess the magnitude of emerging deviations, the degree of their impact on the project completion indicators. The results are recommended to be used to improve the construction project management system, develop documented procedures, and monitor the performance of contract work.

Authors

Publication Details

Journal
Economy Governance and Lave Basis
Published
2024-12-27
DOI
https://doi.org/10.51608/23058641_2024_4_56
Primary Topic
Engineering Technology and Methodologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

COMPREHENSIVE ASSESSMENT OF THE WORK VOLUME IMPLEMENTED IN CONTRACTING FACILITIES

O. S. Holubava
Economy Governance and Lave Basis
Engineering Technology and Methodologies
article

COMPREHENSIVE ASSESSMENT OF THE WORK VOLUME IMPLEMENTED IN CONTRACTING FACILITIES

O. S. Holubava
article en

Abstract

The publication reflects the experience of applying the methodology for assessing the earned value of projects. It is concluded that a scientifically based project management system, including monitoring the earned value, can improve the efficiency of project implementation. The article examines the results of the activities of a contracting organization providing housing construction in Minsk (Republic of Belarus). It is revealed that a systemic problem is the violation of construction deadlines and costs. At the same time, strict cost control leads to the fact that cost deviations do not exceed 2%, and deadline deviations are more than 20%. A conclusion is made about the need to use a comprehensive indicator for assessing the earned value, ensuring monitoring not only the construction cost indicator, but also non-cost indicators: the number of works, their labor intensity and construction period. Using a specific construction project as an example, the progress of contract work is analyzed. The advantages of assessing the earned value of contract work are clearly demonstrated, taking into account a comprehensive assessment of the number of works, their cost, and construction periods. A calculation is made of the reduction in the efficiency of construction activities with an increase in construction periods. The author's scientific contribution consists in developing a methodology for a comprehensive assessment of the developed volume of contract work. The methodology allows not only to monitor the construction progress, identify deviations from the work schedule, but also to assess the magnitude of emerging deviations, the degree of their impact on the project completion indicators. The results are recommended to be used to improve the construction project management system, develop documented procedures, and monitor the performance of contract work.

Economy Governance and Lave Basis(4(43))
Openalex Percentile: Top 63%
Engineering Technology and Methodologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.