Development of ground integrated debugging system of FL-10 wind tunnel

Large wind tunnels are able to simulate the details of the test model more accurately due to their larger test section cross-sectional dimensions. However, the large size of the test model also brings the problem of low model installation efficiency in the wind tunnel. To solve the difficult and complex problem of installing large-sized models in large wind tunnels, with low efficiency, many steps and a long time, a ground-based comprehensive test system for large wind tunnels was developed to reduce the difficulty and time of installing large-sized models in the wind tunnel. This system can detect various problems in the manufacturing, assembly and testing process of the model in advance, and realize the fast installation of large-sized models in large wind tunnels. The application of multiple model test in FL-10 wind tunnel proves that the ground-based comprehensive test system for large wind tunnels has good structural stability, high system automation, and can realize the installation, simulation and testing of large-sized models outside the wind tunnel, effectively improving the test efficiency of FL-10 wind tunnel.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-01
DOI
https://doi.org/10.1049/icp.2024.2947
Primary Topic
Real-Time Systems Scheduling
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of ground integrated debugging system of FL-10 wind tunnel

Xingwang Liu, Weiqiang Mu
IET conference proceedings.
Real-Time Systems Scheduling
article

Development of ground integrated debugging system of FL-10 wind tunnel

Xingwang Liu, Weiqiang Mu
article en

Abstract

Large wind tunnels are able to simulate the details of the test model more accurately due to their larger test section cross-sectional dimensions. However, the large size of the test model also brings the problem of low model installation efficiency in the wind tunnel. To solve the difficult and complex problem of installing large-sized models in large wind tunnels, with low efficiency, many steps and a long time, a ground-based comprehensive test system for large wind tunnels was developed to reduce the difficulty and time of installing large-sized models in the wind tunnel. This system can detect various problems in the manufacturing, assembly and testing process of the model in advance, and realize the fast installation of large-sized models in large wind tunnels. The application of multiple model test in FL-10 wind tunnel proves that the ground-based comprehensive test system for large wind tunnels has good structural stability, high system automation, and can realize the installation, simulation and testing of large-sized models outside the wind tunnel, effectively improving the test efficiency of FL-10 wind tunnel.

IET conference proceedings.Vol. 2024(13)
China Aerodynamics Research and Development Center (CN)
Affordable and clean energy
Openalex Percentile: Top 100%
Real-Time Systems Scheduling
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.