Provoking and Foreseeing Sudden Changes in the Workability of Pumped Concrete
Abstract It was attempted to provoke and foresee sudden loss of workability during concrete pumping through a series of full-scale tests. Batches of 2 m3 concrete were produced at a ready-mix plant, transported by concrete trucks and pumped by industrial pumps, to reveal sudden loss of workability. Different mix designs, extension hoses and pump setups were utilised in a six series experiment. An experimental procedure for measuring loss of workability at a laboratory scale was developed due to the standardised procedures for slump measurements camouflaging loss of workability. The experiments revealed that pumping through a boom seems to have a positive effect by reducing probability of sudden loss of workability. Furthermore, the fine aggregate seems to have a strong influence on the phenomenon, especially in the range of 0.25 mm to 1 mm.
Authors
- Øystein Mortensvik
- Rein Terje Thorstensen (ORCID: https://orcid.org/0000-0002-2813-8656)
Institutions
- University of Agder (NO)
Publication Details
- Journal
- Nordic Concrete Research/Nordic concrete research
- Published
- 2024-12-01
- DOI
- https://doi.org/10.2478/ncr-2024-0005
- Primary Topic
- Innovations in Concrete and Construction Materials
- Type
- article
- Field-Weighted Citation Impact
- 0.00