Quantitative and Qualitative Benefits of Using BIM in Design and Construction Stages for Railway Development

As railway infrastructure projects become increasingly complex, the potential of Building Information Modeling (BIM) technology to enhance project efficiency and management has garnered significant attention. This paper analyzes the quantitative and qualitative benefits of BIM in the design and construction stages of railway development projects through case studies and compares its effectiveness in these two phases. The results indicate that BIM primarily benefits the design stage by reducing design errors and optimizing processes to save costs and time, averaging cost savings of USD 41,000 and a reduction of 49 days in project duration. In the construction stage, the impact of BIM is even more pronounced, reflected in reduced rework, dynamic resource management, and shortened project timelines, leading to savings of USD 710,795 and a reduction of 89 to 104.5 days in project duration. The 3D modeling and real-time information-sharing capabilities of BIM significantly enhance cross-departmental collaboration efficiency and information transparency, minimizing rework caused by communication issues and greatly optimizing project management and execution. This study shows that BIM can lay the groundwork for construction during the design phase and further improve project management efficiency during the construction phase.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-01-09
DOI
https://doi.org/10.3390/buildings15020180
Citations
3
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
3.02
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Quantitative and Qualitative Benefits of Using BIM in Design and Construction Stages for Railway Development

Hwan-Yong Kim, Jianfeng Liao, Min Ho Shin
3 citations
Buildings
BIM and Construction Integration
3.02
article

Quantitative and Qualitative Benefits of Using BIM in Design and Construction Stages for Railway Development

Hwan-Yong Kim, Jianfeng Liao, Min Ho Shin
article en
3 citations

Abstract

As railway infrastructure projects become increasingly complex, the potential of Building Information Modeling (BIM) technology to enhance project efficiency and management has garnered significant attention. This paper analyzes the quantitative and qualitative benefits of BIM in the design and construction stages of railway development projects through case studies and compares its effectiveness in these two phases. The results indicate that BIM primarily benefits the design stage by reducing design errors and optimizing processes to save costs and time, averaging cost savings of USD 41,000 and a reduction of 49 days in project duration. In the construction stage, the impact of BIM is even more pronounced, reflected in reduced rework, dynamic resource management, and shortened project timelines, leading to savings of USD 710,795 and a reduction of 89 to 104.5 days in project duration. The 3D modeling and real-time information-sharing capabilities of BIM significantly enhance cross-departmental collaboration efficiency and information transparency, minimizing rework caused by communication issues and greatly optimizing project management and execution. This study shows that BIM can lay the groundwork for construction during the design phase and further improve project management efficiency during the construction phase.

BuildingsVol. 15(2)
Hanyang University (KR), Woosong University (KR)
Openalex Percentile: Top 11%
BIM and Construction Integration
3.02
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.