Transfer-Robot Task Allocation Algorithm Considering Production Priority for Flexible Job-Shop Scheduling Problem

This paper proposes a flexible job-shop scheduling problem optimization method, which focuses on providing solutions for industrial production. First, in terms of model construction, the method further considers the cost of automated guided vehicles and the priority of workpiece production based on previous methods. Then, this method solves the model by non-dominated sorting genetic algorithm with self-cross and delete-mutation. It reduces the production time and energy by an average of 6.4% and 19.4%, which are 5.4% and 15.1% with the priority. Finally, the simulation verifies that the method effectively reduces the production cost while realizing the adjustment of the automated guided vehicle number and the workpiece production sequence.

Authors

Institutions

Publication Details

Published
2024-12-12
DOI
https://doi.org/10.1109/icarcv63323.2024.10821565
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transfer-Robot Task Allocation Algorithm Considering Production Priority for Flexible Job-Shop Scheduling Problem

Xinheng Wang, Jing Wang, Zhongxing Liang, Wang Chang et al.
Scheduling and Optimization Algorithms
article

Transfer-Robot Task Allocation Algorithm Considering Production Priority for Flexible Job-Shop Scheduling Problem

Xinheng Wang, Jing Wang, Zhongxing Liang, Wang Chang, Meng Zhou
article en

Abstract

This paper proposes a flexible job-shop scheduling problem optimization method, which focuses on providing solutions for industrial production. First, in terms of model construction, the method further considers the cost of automated guided vehicles and the priority of workpiece production based on previous methods. Then, this method solves the model by non-dominated sorting genetic algorithm with self-cross and delete-mutation. It reduces the production time and energy by an average of 6.4% and 19.4%, which are 5.4% and 15.1% with the priority. Finally, the simulation verifies that the method effectively reduces the production cost while realizing the adjustment of the automated guided vehicle number and the workpiece production sequence.

North China University of Technology (CN), Beijing Aerospace Flight Control Center (CN)
National Key Research and Development Program of China
Decent work and economic growth
Openalex Percentile: Top 63%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.