Reversible retrofit to hydro plants for better renewables consumption in Central China

Substituting coal electricity with renewables is the fundamental measure to achieve carbon neutrality in China. However, the intermittency and the poor flexibility of power systems hinders the accommodation of renewables. Here, we put forward a new concept of reversible hydro plants that enable charging and discharging operation modes which are similar to pumped hydro but have lower construction costs. An integrated planning model is proposed to identify the benefits. First, a cost estimation model was constructed to identify the development potential and retrofit costs. Then, a planning model embedded with hourly dispatch for power systems is built to optimize the retrofit decision on reversible hydro plants. Finally, the power systems of Central China were applied to validate the benefits and generate the optimized retrofit plan. Results show that the reversible hydropower retrofit can effectively decrease the renewable curtailment and operation costs in Central China.

Authors

Institutions

Publication Details

Published
2024-10-25
DOI
https://doi.org/10.1109/sges63808.2024.10824104
Primary Topic
Power Systems and Renewable Energy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reversible retrofit to hydro plants for better renewables consumption in Central China

Xinke Qin, Yaxing Liu, Xinyu Chen, Li Chengyuan
Power Systems and Renewable Energy
article

Reversible retrofit to hydro plants for better renewables consumption in Central China

Xinke Qin, Yaxing Liu, Xinyu Chen, Li Chengyuan
article en

Abstract

Substituting coal electricity with renewables is the fundamental measure to achieve carbon neutrality in China. However, the intermittency and the poor flexibility of power systems hinders the accommodation of renewables. Here, we put forward a new concept of reversible hydro plants that enable charging and discharging operation modes which are similar to pumped hydro but have lower construction costs. An integrated planning model is proposed to identify the benefits. First, a cost estimation model was constructed to identify the development potential and retrofit costs. Then, a planning model embedded with hourly dispatch for power systems is built to optimize the retrofit decision on reversible hydro plants. Finally, the power systems of Central China were applied to validate the benefits and generate the optimized retrofit plan. Results show that the reversible hydropower retrofit can effectively decrease the renewable curtailment and operation costs in Central China.

Huazhong University of Science and Technology (CN)
Affordable and clean energy
Openalex Percentile: Top 73%
Power Systems and Renewable Energy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Reversible retrofit to hydro plants for better renewables consumption in Central China — Xinke Qin, Yaxing Liu, et al. · (2024) | TGRS Research Map | TGRS