Techno-economical assessment of battery storage combined with large-scale Photovoltaic power plants operating on energy and Ancillary Service Markets

A significant challenge is to determine the specific services Battery Energy Storage System (BESS) should provide to maximize profits. This study investigates the most profitable markets and sizes of BESS with utility-scale solar Photovoltaics (PV) power plants using techno-economic analysis frameworks. The objective is to maximize profitability in energy and frequency markets, focusing on primary regulation and day-ahead markets for Sweden and Germany. The inputs are historical market prices and frequency data, as well as real measurement PV power data. The results show that adding a BESS to an existing PV park does not result in a lower payback period than if implementing a stand-alone BESS. However, the payback period differs between Sweden and Germany during 2023, i.e., being 1.8 and 6.8 years, respectively. This is explained by the lower frequency market prices for Germany compared to Sweden. The technical results indicate that the BESS energy capacity after 10 years of operation is approximately 83% for Germany, whereas, for Sweden, it is around 87%. Also, combining the operating of BESS on primary regulation and day-ahead markets showed a 6-year payback period with a slight increase in loss of energy capacity (from 83 to 80%) for Germany. Moreover, combining various PV-BESS sizes showed a discrepancy in economic and technical metrics for the BESS in Germany, resulting in a best-case of a 6-year payback period. A sensitivity analysis, which examines a drop in the frequency control prices in the future relative to 2023 (by 20% and 50% for Germany and Sweden, respectively), reveals an increase in the payback period for both countries by approximately 1 year.

Authors

Publication Details

Journal
Applied Energy
Published
2025-01-09
DOI
https://doi.org/10.1016/j.apenergy.2024.125200
Citations
16
Primary Topic
Advanced Battery Technologies Research
Type
article
Field-Weighted Citation Impact
10.93

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Techno-economical assessment of battery storage combined with large-scale Photovoltaic power plants operating on energy and Ancillary Service Markets

Pei Huang, David Lingfors, Joakim Munkhammar, Oskar Lindberg et al.
16 citations
Applied Energy
Advanced Battery Technologies Research
10.93
article

Techno-economical assessment of battery storage combined with large-scale Photovoltaic power plants operating on energy and Ancillary Service Markets

Pei Huang, David Lingfors, Joakim Munkhammar, Oskar Lindberg, Mohamad Koubar, Magnus Berg
article en
16 citations

Abstract

A significant challenge is to determine the specific services Battery Energy Storage System (BESS) should provide to maximize profits. This study investigates the most profitable markets and sizes of BESS with utility-scale solar Photovoltaics (PV) power plants using techno-economic analysis frameworks. The objective is to maximize profitability in energy and frequency markets, focusing on primary regulation and day-ahead markets for Sweden and Germany. The inputs are historical market prices and frequency data, as well as real measurement PV power data. The results show that adding a BESS to an existing PV park does not result in a lower payback period than if implementing a stand-alone BESS. However, the payback period differs between Sweden and Germany during 2023, i.e., being 1.8 and 6.8 years, respectively. This is explained by the lower frequency market prices for Germany compared to Sweden. The technical results indicate that the BESS energy capacity after 10 years of operation is approximately 83% for Germany, whereas, for Sweden, it is around 87%. Also, combining the operating of BESS on primary regulation and day-ahead markets showed a 6-year payback period with a slight increase in loss of energy capacity (from 83 to 80%) for Germany. Moreover, combining various PV-BESS sizes showed a discrepancy in economic and technical metrics for the BESS in Germany, resulting in a best-case of a 6-year payback period. A sensitivity analysis, which examines a drop in the frequency control prices in the future relative to 2023 (by 20% and 50% for Germany and Sweden, respectively), reveals an increase in the payback period for both countries by approximately 1 year.

Applied EnergyVol. 382
Energimyndigheten
Affordable and clean energy
Openalex Percentile: Top 1%
Advanced Battery Technologies Research
10.93
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Techno-economical assessment of battery storage combined with large-scale Photovoltaic power plants operating on energy and Ancillary Service Markets — Pei Huang, David Lingfors, et al. · Applied Energy (2025) | TGRS Research Map | TGRS