Lessons Learned from Quantifying IEC 61850 Station bus Performance

The paper discusses several key findings and observations related to the performance of a high voltage IEC 61850 substation before it was energized. The impact of organisational structure, skills, tools, data, and performance measurement methodologies on the utility's ability to transition to the automated substation is contextualised with the results indicating that it is possible to analyse and debug a substation communication network using open-source tools. The analysis of station bus performance revealed that the duration of a successful RSTP topology change, ranged from 5s to 24s, impacting GOOSE reception during that time. Furthermore, when traffic was injected to increase traffic on the inter-switch uplink ports to full capacity, the MMS transmission failed between the SCADA Gateway and IED under test because the traffic needed to traverse across the switches. Finally, the paper highlights how the networked substation itself, configurable substation devices and redundancy makes understanding the root cause of observations both complex and time consuming.

Authors

Institutions

Publication Details

Published
2024-10-07
DOI
https://doi.org/10.1109/powerafrica61624.2024.10759365
Primary Topic
Smart Grid Security and Resilience
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Lessons Learned from Quantifying IEC 61850 Station bus Performance

Tahir Mehmood Khan, Ravinder Singh
Smart Grid Security and Resilience
article

Lessons Learned from Quantifying IEC 61850 Station bus Performance

Tahir Mehmood Khan, Ravinder Singh
article en

Abstract

The paper discusses several key findings and observations related to the performance of a high voltage IEC 61850 substation before it was energized. The impact of organisational structure, skills, tools, data, and performance measurement methodologies on the utility's ability to transition to the automated substation is contextualised with the results indicating that it is possible to analyse and debug a substation communication network using open-source tools. The analysis of station bus performance revealed that the duration of a successful RSTP topology change, ranged from 5s to 24s, impacting GOOSE reception during that time. Furthermore, when traffic was injected to increase traffic on the inter-switch uplink ports to full capacity, the MMS transmission failed between the SCADA Gateway and IED under test because the traffic needed to traverse across the switches. Finally, the paper highlights how the networked substation itself, configurable substation devices and redundancy makes understanding the root cause of observations both complex and time consuming.

eThekwini Municipality (ZA)
Openalex Percentile: Top 70%
Smart Grid Security and Resilience
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.