Assessing Cable Sizing for PV Microgrids: Economic and Environmental Factors in Focus - A Case Study of Ethiopia and Rwanda

To address the problem of unequal access to affordable and modern energy systems (SDG 7) in sub-Saharan countries and achieve the goals outlined in SDG 13, microgrids supported by photovoltaic systems offer a promising solution. However, deploying microgrid systems requires addressing financial challenges, ensuring operational efficiency, and carefully considering each component of the system, including cables, which play a crucial role in power distribution. Conventional cable sizing standards prioritize safety and cost reduction but often overlook the lifetime perspective of economic and environmental factors, particularly for renewable energy sources. Incorrect cable sizing can result in power loss, emissions, unreliable operation, and high installation costs. Therefore, this study aims to evaluate cable sizing for PV microgrids, with a specific focus on economic and environmental considerations in Ethiopia and Rwanda. The results indicate that determining the most cost-effective and environmentally friendly cable size is a challenge due to various influencing factors. However, there is significant potential for oversizing cables in countries like Rwanda. In Ethiopia, there are currently no financial incentives to oversize cables for PV installations under the current circumstances.

Authors

Institutions

Publication Details

Published
2024-10-07
DOI
https://doi.org/10.1109/powerafrica61624.2024.10759427
Citations
1
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
0.21
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Assessing Cable Sizing for PV Microgrids: Economic and Environmental Factors in Focus - A Case Study of Ethiopia and Rwanda

Milky Ali Gelchu, Pierre Damien Uwitije, Jimmy Ehnberg
1 citations
Electric Vehicles and Infrastructure
0.21
article

Assessing Cable Sizing for PV Microgrids: Economic and Environmental Factors in Focus - A Case Study of Ethiopia and Rwanda

Milky Ali Gelchu, Pierre Damien Uwitije, Jimmy Ehnberg
article en
1 citations

Abstract

To address the problem of unequal access to affordable and modern energy systems (SDG 7) in sub-Saharan countries and achieve the goals outlined in SDG 13, microgrids supported by photovoltaic systems offer a promising solution. However, deploying microgrid systems requires addressing financial challenges, ensuring operational efficiency, and carefully considering each component of the system, including cables, which play a crucial role in power distribution. Conventional cable sizing standards prioritize safety and cost reduction but often overlook the lifetime perspective of economic and environmental factors, particularly for renewable energy sources. Incorrect cable sizing can result in power loss, emissions, unreliable operation, and high installation costs. Therefore, this study aims to evaluate cable sizing for PV microgrids, with a specific focus on economic and environmental considerations in Ethiopia and Rwanda. The results indicate that determining the most cost-effective and environmentally friendly cable size is a challenge due to various influencing factors. However, there is significant potential for oversizing cables in countries like Rwanda. In Ethiopia, there are currently no financial incentives to oversize cables for PV installations under the current circumstances.

University of Rwanda (RW), Addis Ababa University (ET), Chalmers University of Technology (SE)
Climate action
Openalex Percentile: Top 44%
Electric Vehicles and Infrastructure
0.21
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Assessing Cable Sizing for PV Microgrids: Economic and Environmental Factors in Focus - A Case Study of Ethiopia and Rwanda — Milky Ali Gelchu, Pierre Damien Uwitije, et al. · (2024) | TGRS Research Map | TGRS