Research on the automatic BIM modeling method of substation based on LLM agent

Substations, as crucial components of the power system, play a vital role in the design, construction, operation, and maintenance of smart grids. Traditional substation modeling methods often rely on manual operations, suffering from issues such as long modeling cycles, low accuracy, and poor collaboration. However, with the rapid development of information technology, particularly the continuous advancements in artificial intelligence (AI) and Building Information Modeling (BIM) technologies, new solutions for substation modeling have emerged. This paper primarily investigates an architecture that combines Large Language Model (LLM) with intelligent agents, utilizing large models to construct an intelligent agent system. This system is trained to recognize two-dimensional drawings and employs intelligent agents to invoke Revit tools for three- dimensional BIM modeling of substations. Compared to traditional modeling methods, this approach significantly enhances the efficiency and accuracy of substation modeling while reducing modeling costs, promising to accelerate the development of smart grid construction. Therefore, the automatic BIM modeling method for substations using LLM intelligent agents holds broad application prospects and development potential in modern smart grid construction.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-09
DOI
https://doi.org/10.1049/icp.2024.4301
Citations
1
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on the automatic BIM modeling method of substation based on LLM agent

Liang Zhou, Dongzi Li, Hang Cai, Ling Pan et al.
1 citations
IET conference proceedings.
Power Systems and Technologies
0.73
article

Research on the automatic BIM modeling method of substation based on LLM agent

Liang Zhou, Dongzi Li, Hang Cai, Ling Pan, Yan Tong, Jianyong Shi, Yizhang Huang
article en
1 citations

Abstract

Substations, as crucial components of the power system, play a vital role in the design, construction, operation, and maintenance of smart grids. Traditional substation modeling methods often rely on manual operations, suffering from issues such as long modeling cycles, low accuracy, and poor collaboration. However, with the rapid development of information technology, particularly the continuous advancements in artificial intelligence (AI) and Building Information Modeling (BIM) technologies, new solutions for substation modeling have emerged. This paper primarily investigates an architecture that combines Large Language Model (LLM) with intelligent agents, utilizing large models to construct an intelligent agent system. This system is trained to recognize two-dimensional drawings and employs intelligent agents to invoke Revit tools for three- dimensional BIM modeling of substations. Compared to traditional modeling methods, this approach significantly enhances the efficiency and accuracy of substation modeling while reducing modeling costs, promising to accelerate the development of smart grid construction. Therefore, the automatic BIM modeling method for substations using LLM intelligent agents holds broad application prospects and development potential in modern smart grid construction.

IET conference proceedings.Vol. 2024(21)
Shanghai Jiao Tong University (CN), Shanghai Electric (China) (CN), Chongqing Jiaotong University (CN)
Openalex Percentile: Top 32%
Power Systems and Technologies
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Research on the automatic BIM modeling method of substation based on LLM agent — Liang Zhou, Dongzi Li, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS