Network-wide mixed-rail traffic scheduler: challenges and implementation aspects
In 2020, Indian Railways took up a de novo timetabling exercise for the Golden Quadrilateral and Diagonals (GQD) connecting Mumbai-Delhi-Kolkata-Chennai, involving about 1700 trains on a weekly basis over a network of 9,099 km. Based on significant participation in this activity, this paper elaborates on the challenges faced in a network-wide simulation and scheduling of trains across a large network. The methods to address these challenges and the software implementation aspects are also described. A network-wide mixed-rail traffic simulator was used successfully to construct a daily timetable for the GQD. The two primary goals of the Zero Based Timetabling (ZBTT) project were to generate train schedules that were: (a) feasible (in terms of kinematic constraints on both trains running and block-section, running lines) and (b) conflict-free (due to multiple trains having to share resources and the need to ensure time-durations of resource usage are different, subject to safety constraints), for a proposed set of departure timings and halt patterns of all the services that were planned on the GQD.
Authors
- Madhu N. Belur (ORCID: https://orcid.org/0000-0002-1942-6293)
- Sudarshan Pulapadi
- Merajus Salekin
- Narayan Rangaraj (ORCID: https://orcid.org/0000-0003-3595-0965)
- Karim Shahbaz (ORCID: https://orcid.org/0000-0002-4969-4686)
- Samay P. Singh
- Raja Gopalakrishnan (ORCID: https://orcid.org/0000-0001-9685-7276)
- Mayurika S Tyagi (ORCID: https://orcid.org/0000-0001-8676-042X)
- Sidhartha I Kumar
- Satwik V. Ramisetty
Institutions
- Indian Institute of Technology Bombay (IN)
Publication Details
- Journal
- Transportation research procedia
- Published
- 2025-01-01
- DOI
- https://doi.org/10.1016/j.trpro.2024.12.193
- Primary Topic
- Railway Systems and Energy Efficiency
- Type
- article
- Field-Weighted Citation Impact
- 0.00