Hosting capacity in the Croatian regulatory environment

Installing distributed energy resources (DERs) in low voltage networks is limited by distribution grid codes, often defining a conservative connection power threshold, especially in the case of a single-phase connection or by the network’s technical constraints. Calculating the maximum installed power in that way is called hosting capacity (HC). Traditional HC calculation presents an assessment of static connection limits, determined by the lowest or highest electricity demand, depending on whether export or import limits are calculated. In this paper, we calculate the available range of aggregated active power of DERs based on worst-case and base-case demand scenarios. The results suggest the potential grid code redefinition since the analysed network can accommodate additional DERs in the range of 300 and 500 kW, compared to the current grid code limits. When observing only the grid code limitations in the import limits analysis, the results show an unrealistically high integration of more than 750 kW DERs, which is even higher than the best-case scenario. In the worst-case scenario, no additional DERs can be installed due to the initial violation of the network's constraints. Dynamic export and import limits are in the theoretical range of values, showing the benefit of the concept.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-01
DOI
https://doi.org/10.1049/icp.2024.1904
Citations
1
Primary Topic
Regulation and Compliance Studies
Type
article
Field-Weighted Citation Impact
2.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hosting capacity in the Croatian regulatory environment

Tomislav Antić, Tomislav Capuder
1 citations
IET conference proceedings.
Regulation and Compliance Studies
2.23
article

Hosting capacity in the Croatian regulatory environment

Tomislav Antić, Tomislav Capuder
article en
1 citations

Abstract

Installing distributed energy resources (DERs) in low voltage networks is limited by distribution grid codes, often defining a conservative connection power threshold, especially in the case of a single-phase connection or by the network’s technical constraints. Calculating the maximum installed power in that way is called hosting capacity (HC). Traditional HC calculation presents an assessment of static connection limits, determined by the lowest or highest electricity demand, depending on whether export or import limits are calculated. In this paper, we calculate the available range of aggregated active power of DERs based on worst-case and base-case demand scenarios. The results suggest the potential grid code redefinition since the analysed network can accommodate additional DERs in the range of 300 and 500 kW, compared to the current grid code limits. When observing only the grid code limitations in the import limits analysis, the results show an unrealistically high integration of more than 750 kW DERs, which is even higher than the best-case scenario. In the worst-case scenario, no additional DERs can be installed due to the initial violation of the network's constraints. Dynamic export and import limits are in the theoretical range of values, showing the benefit of the concept.

IET conference proceedings.Vol. 2024(5)
University of Zagreb (HR)
Partnerships for the goals
Openalex Percentile: Top 14%
Regulation and Compliance Studies
2.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.