The impact of battery energy storage systems and their potential use as a flexibility in operational planning process

Stationary battery energy storage systems (BESS) at utility level are emerging as an attractive solution mainly due to the evolution of the technology and the definition of new energy and ancillary services. While BESS offer significant flexibility, their high power and capacity present challenges for distribution system operators in several processes such as the short-term operational planning. In the present paper, the impact of BESS in the short-term operational planning is analysed considering a real medium voltage distribution grid and realistic power consumption and generation scenarios. To perform this analysis a framework based in open-source tools was developed, including the power flow simulation and the operational planning algorithms. The first conclusion of the assessment is that BESS should be modelled in the operational planning process and new ways of representing the flexibility of BESS are needed. The concept of power operation enveloped has been tested showing the effectiveness of the method to addresses the challenges introduced by BESS.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-01
DOI
https://doi.org/10.1049/icp.2024.1933
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The impact of battery energy storage systems and their potential use as a flexibility in operational planning process

Herbert Amezquita, Jamilson Junior, Hugo Morais, Ali El-Akoum et al.
IET conference proceedings.
Electric Vehicles and Infrastructure
article

The impact of battery energy storage systems and their potential use as a flexibility in operational planning process

Herbert Amezquita, Jamilson Junior, Hugo Morais, Ali El-Akoum, Naji Nassar, David Roux
article en

Abstract

Stationary battery energy storage systems (BESS) at utility level are emerging as an attractive solution mainly due to the evolution of the technology and the definition of new energy and ancillary services. While BESS offer significant flexibility, their high power and capacity present challenges for distribution system operators in several processes such as the short-term operational planning. In the present paper, the impact of BESS in the short-term operational planning is analysed considering a real medium voltage distribution grid and realistic power consumption and generation scenarios. To perform this analysis a framework based in open-source tools was developed, including the power flow simulation and the operational planning algorithms. The first conclusion of the assessment is that BESS should be modelled in the operational planning process and new ways of representing the flexibility of BESS are needed. The concept of power operation enveloped has been tested showing the effectiveness of the method to addresses the challenges introduced by BESS.

IET conference proceedings.Vol. 2024(5)
Instituto de Engenharia de Sistemas e Computadores Investigação e Desenvolvimento (PT), Électricité de France (France) (FR), Instituto Superior de Tecnologias Avançadas (PT), Instituto Superior Técnico (PT)
Affordable and clean energy
Openalex Percentile: Top 100%
Electric Vehicles and Infrastructure
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.