Hosting capacity calculation across different voltage levels considering universal and local regulation-based technical constraints

The hosting capacity (HC) of additional distributed energy resources (DERs) integrated into the distribution grids is limited by multiple technical factors defined by international and national regulations. In this paper, a generic methodology for the HC calculation is presented considering the HC influence on other interconnected grids. The technical constraints include bounds for the voltage quality, and the loading of grid assets. Next, a specific use case based on the Spanish regulation is developed, considering various limits for the loading of grid assets, voltage quality, power capacity, and the short-circuit power ratio. For mesh grids, the unavailability of supply through N-1 analyses is also evaluated. It is evident that the HC is more realistically calculated due to the impact of interconnected grids, while the constraints of the Spanish regulation can restrict further the HC.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-01
DOI
https://doi.org/10.1049/icp.2024.2048
Primary Topic
Optimal Power Flow Distribution
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Hosting capacity calculation across different voltage levels considering universal and local regulation-based technical constraints

Nikolaos Efkarpidis, J. Figueras, S. Saraswati, Patrick Lieberherr et al.
IET conference proceedings.
Optimal Power Flow Distribution
article

Hosting capacity calculation across different voltage levels considering universal and local regulation-based technical constraints

Nikolaos Efkarpidis, J. Figueras, S. Saraswati, Patrick Lieberherr, Adrian Paeckel, Sanket Jhala, Stergios Dagioglou
article en

Abstract

The hosting capacity (HC) of additional distributed energy resources (DERs) integrated into the distribution grids is limited by multiple technical factors defined by international and national regulations. In this paper, a generic methodology for the HC calculation is presented considering the HC influence on other interconnected grids. The technical constraints include bounds for the voltage quality, and the loading of grid assets. Next, a specific use case based on the Spanish regulation is developed, considering various limits for the loading of grid assets, voltage quality, power capacity, and the short-circuit power ratio. For mesh grids, the unavailability of supply through N-1 analyses is also evaluated. It is evident that the HC is more realistically calculated due to the impact of interconnected grids, while the constraints of the Spanish regulation can restrict further the HC.

IET conference proceedings.Vol. 2024(5)
Udaipur Solar Observatory (IN)
Openalex Percentile: Top 100%
Optimal Power Flow Distribution
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.