Increasing low voltage grid hosting capacity for production by active power flexibility: cost-benefit analysis and sensitivity study

In the baseline scenario of its “Plan de développement de reseau” (network development plan), ENEDIS (France's main DSO) expects to host 70GW of renewable energy in 2032, compared with around 28GW today. Substantial investment will be needed to support this scenario, while maintaining a secure and efficient power grid. To limit some of these investments or spread them over time, flexibilities can be used in certain situations. In the first part of this paper, we present an approach aimed at identifying situations where power curtailment on a specific low voltage grid may present an economic interest for the community. It highlights the key parameters which influence the benefits of this flexibility and concludes that it should be assessed on a case-by-case basis. In the second part, we look at the potential gain in terms of additional hosting capacity that a connection with power curtailment can bring compared with a conventional connection. In this stage, no constraints are authorized on the grid, i.e. no reinforcement would be needed to connect the producer. The gain in hosting capacity is presented in the form of a map.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-01
DOI
https://doi.org/10.1049/icp.2024.1982
Primary Topic
Smart Grid Energy Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Increasing low voltage grid hosting capacity for production by active power flexibility: cost-benefit analysis and sensitivity study

Cyril Gisbert, Yugurtha Abdesselam, Louis Garbay, Tristan Aubin et al.
IET conference proceedings.
Smart Grid Energy Management
article

Increasing low voltage grid hosting capacity for production by active power flexibility: cost-benefit analysis and sensitivity study

Cyril Gisbert, Yugurtha Abdesselam, Louis Garbay, Tristan Aubin, Romain Perrouault
article en

Abstract

In the baseline scenario of its “Plan de développement de reseau” (network development plan), ENEDIS (France's main DSO) expects to host 70GW of renewable energy in 2032, compared with around 28GW today. Substantial investment will be needed to support this scenario, while maintaining a secure and efficient power grid. To limit some of these investments or spread them over time, flexibilities can be used in certain situations. In the first part of this paper, we present an approach aimed at identifying situations where power curtailment on a specific low voltage grid may present an economic interest for the community. It highlights the key parameters which influence the benefits of this flexibility and concludes that it should be assessed on a case-by-case basis. In the second part, we look at the potential gain in terms of additional hosting capacity that a connection with power curtailment can bring compared with a conventional connection. In this stage, no constraints are authorized on the grid, i.e. no reinforcement would be needed to connect the producer. The gain in hosting capacity is presented in the form of a map.

IET conference proceedings.Vol. 2024(5)
École Polytechnique Fédérale de Lausanne (CH)
Affordable and clean energy
Openalex Percentile: Top 100%
Smart Grid Energy Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.