Explosion hazard analysis of LNG tank trucks passing through cross sea bridges after unloading

A small amount of liquefied natural gas (LNG) often remains inside tank trucks after unloading. This paper investigates the safety of LNG tank trucks traversing cross-sea bridges post-unloading. Using the process hazard analysis software tool PHAST, the study calculates methane leakage and dispersion from holes in pipelines connected to LNG tanks, as well as the explosion consequences of methane-air mixtures. An explosion overpressure value of 0.10 MPa is used as the hazard evaluation criterion. The results indicate that even with only 0.10% to 0.50% of the rated filling capacity of the LNG tanks remaining after unloading, if the leakage breach diameters exceed 25 mm, the resulting maximum explosion overpressure may surpass 0.10 MPa. This level of overpressure could cause permanent damage to the reinforced concrete structures of cross-sea bridges. Therefore, to ensure the safety of cross-sea bridges, it is not advisable to allow unloaded LNG tank trucks to pass through these structures.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-01
DOI
https://doi.org/10.1049/icp.2024.3671
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Explosion hazard analysis of LNG tank trucks passing through cross sea bridges after unloading

Lijing Mu, Zhongqiang Liu, Zheng Fang, Xiaolian Guo et al.
IET conference proceedings.
Risk and Safety Analysis
article

Explosion hazard analysis of LNG tank trucks passing through cross sea bridges after unloading

Lijing Mu, Zhongqiang Liu, Zheng Fang, Xiaolian Guo, Guide Deng
article en

Abstract

A small amount of liquefied natural gas (LNG) often remains inside tank trucks after unloading. This paper investigates the safety of LNG tank trucks traversing cross-sea bridges post-unloading. Using the process hazard analysis software tool PHAST, the study calculates methane leakage and dispersion from holes in pipelines connected to LNG tanks, as well as the explosion consequences of methane-air mixtures. An explosion overpressure value of 0.10 MPa is used as the hazard evaluation criterion. The results indicate that even with only 0.10% to 0.50% of the rated filling capacity of the LNG tanks remaining after unloading, if the leakage breach diameters exceed 25 mm, the resulting maximum explosion overpressure may surpass 0.10 MPa. This level of overpressure could cause permanent damage to the reinforced concrete structures of cross-sea bridges. Therefore, to ensure the safety of cross-sea bridges, it is not advisable to allow unloaded LNG tank trucks to pass through these structures.

IET conference proceedings.Vol. 2024(12)
China Special Equipment Inspection and Research Institute (CN), Zhejiang Institute of Special Equipment Inspection (CN)
Life below water
Openalex Percentile: Top 99%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Explosion hazard analysis of LNG tank trucks passing through cross sea bridges after unloading — Lijing Mu, Zhongqiang Liu, et al. · IET conference proceedings. (2025) | TGRS Research Map | TGRS