The research and application of risk-managed technical specifications for typical nuclear power plant

Risk-managed technical specification (RMTS) is a plant-specific technical specification based on plant configuration to determine the completion times (CT) of components in real time by evaluating the risk. With the technological advancement of the domestic risk-informed application and the release of the "Technical Policy on Configuration Risk Management of Nuclear Power Plants”, it creates a convenient condition for the implementation of RMTS for the nuclear power plants, and the implementation of RMTS can improve operational flexibility and extend the CT of safety systems under the premise of guaranteeing the safety of the unit. This paper gives the principles and prerequisites for implementing RMTS, and takes typical safety systems of a typical VVER unit as the research object to carry out the optimization analysis of implementing RMTS. In the meantime, this paper evaluates the impact of external events on the implementation of RMTS by taking an internal fire as an example, which provides guidance and suggestions for the subsequent in-depth research and engineering application.

Authors

Institutions

Publication Details

Journal
IET conference proceedings.
Published
2025-01-01
DOI
https://doi.org/10.1049/icp.2024.3457
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The research and application of risk-managed technical specifications for typical nuclear power plant

Chao Ma, Fangyu Dong, Churan Feng, Rui Zhang et al.
IET conference proceedings.
Risk and Safety Analysis
article

The research and application of risk-managed technical specifications for typical nuclear power plant

Chao Ma, Fangyu Dong, Churan Feng, Rui Zhang, Qingqing Xu, Lin Yan
article en

Abstract

Risk-managed technical specification (RMTS) is a plant-specific technical specification based on plant configuration to determine the completion times (CT) of components in real time by evaluating the risk. With the technological advancement of the domestic risk-informed application and the release of the "Technical Policy on Configuration Risk Management of Nuclear Power Plants”, it creates a convenient condition for the implementation of RMTS for the nuclear power plants, and the implementation of RMTS can improve operational flexibility and extend the CT of safety systems under the premise of guaranteeing the safety of the unit. This paper gives the principles and prerequisites for implementing RMTS, and takes typical safety systems of a typical VVER unit as the research object to carry out the optimization analysis of implementing RMTS. In the meantime, this paper evaluates the impact of external events on the implementation of RMTS by taking an internal fire as an example, which provides guidance and suggestions for the subsequent in-depth research and engineering application.

IET conference proceedings.Vol. 2024(12)
China General Nuclear Power Corporation (China) (CN)
Affordable and clean energy
Openalex Percentile: Top 99%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.