The Hidden Costs of Geological Overbreak (GOB) in EPC Tunnel Projects: Assessing the Economic Impact

Overbreak, defined as the excavation of excess material beyond the required tunnel profile, is a common issue in tunnel construction, particularly in tunnels constructed using New Austrian Tunnelling Method (NATM). In the context of Jammu and Kashmir, India, five tunnels are currently being constructed along National Highway-44 (NH-44) under the National Highways Authority of India (NHAI). Given the region's complex and varied geology, NATM has been adopted for these tunnel projects. This study focuses on one such under-construction twin-tube tunnel, measuring 4.3 km in length. Notably, the contract agreements for these tunnels do not account for geological overbreak (GOB), with no provisions for compensating contractors for additional excavation costs. The study involved a detailed analysis comparing the theoretical and actual quantities of shotcrete applied, along with the calculation of rebound quantities. Using Amberg Software, tunnel sections were modelled to better understand the extent of overbreak. The research quantified the additional costs incurred by the contractor due to GOB and proposed recommendations for addressing such issues in future projects.

Authors

Institutions

Publication Details

Journal
International Journal of Innovative Research in Engineering & Management
Published
2024-12-01
DOI
https://doi.org/10.55524/ijirem.2024.11.6.14
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Hidden Costs of Geological Overbreak (GOB) in EPC Tunnel Projects: Assessing the Economic Impact

Gaurav Singh, Peerzada Mohsin Shafi
International Journal of Innovative Research in Engineering & Management
Tunneling and Rock Mechanics
article

The Hidden Costs of Geological Overbreak (GOB) in EPC Tunnel Projects: Assessing the Economic Impact

Gaurav Singh, Peerzada Mohsin Shafi
article en

Abstract

Overbreak, defined as the excavation of excess material beyond the required tunnel profile, is a common issue in tunnel construction, particularly in tunnels constructed using New Austrian Tunnelling Method (NATM). In the context of Jammu and Kashmir, India, five tunnels are currently being constructed along National Highway-44 (NH-44) under the National Highways Authority of India (NHAI). Given the region's complex and varied geology, NATM has been adopted for these tunnel projects. This study focuses on one such under-construction twin-tube tunnel, measuring 4.3 km in length. Notably, the contract agreements for these tunnels do not account for geological overbreak (GOB), with no provisions for compensating contractors for additional excavation costs. The study involved a detailed analysis comparing the theoretical and actual quantities of shotcrete applied, along with the calculation of rebound quantities. Using Amberg Software, tunnel sections were modelled to better understand the extent of overbreak. The research quantified the additional costs incurred by the contractor due to GOB and proposed recommendations for addressing such issues in future projects.

International Journal of Innovative Research in Engineering & ManagementVol. 11(6)
American Society of Civil Engineers (US)
Strong, Chitkara University
Openalex Percentile: Top 71%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.